BLG 4A
Safety Light Curtain
Alignment
4
www.balluff.com
11
english
The following section lists essentials tests that must be performed following initial installation and
during semi-annual inspection and regular maintenance. Inspection must be performed prior to
each startup of the machine. Inspections must be performed by qualified and trained personnel,
i.e. directly or under the supervision of the deputy for machine safety. Please follow the check list
contained on the included CD for semi-annual inspection and regular maintenance.
Check the following points:
►
The AOPD remains turned off (
) as long as the protection field is interrupted in the
inspection routine and using the corresponding test rod as shown in Figure 7 . Use the
following test rods (see operating manual Accessories “12.8 Test rod”):
– BAM TO-LG-011-14 for light curtains with 14 mm resolution (BLG 4A-…-014-…)
– BAM TO-LG-011-30 for light curtains with 30 mm resolution (BLG 4A-…-030-…)
4.4 Testing
Содержание BLG 4A Series
Страница 1: ...BLG 4A Sicherheitslichtvorhang deutsch Kurzanleitung english Short Guide...
Страница 2: ...www balluff com...
Страница 3: ...deutsch BLG 4A Sicherheitslichtvorhang Kurzanleitung...
Страница 21: ...english BLG 4A Safety Light Curtain Short guide...
Страница 39: ......