Care2
Installation Instructions
Care2 issue 9
83
7.8 R
OUTINE
M
AINTENANCE
R
EQUIREMENTS
The Care2 System has been designed to meet the requirements of
BS5839-9:2011, however the standard also provides
recommendations for Maintenance and routine testing of the
system that should be performed by the user.
The following sections of this Manual briefly describe the relevant
requirements of BS5839-9:2011.
7.8.1 Appointment of a “Responsible Person”
A single, named person should be appointed to be responsible for
all matters relating the Care2 System.
This person is responsible for the following activities:
• Ensuring the Testing and Servicing is performed according to
the requirements described in Section 7.8.2.
• Ensuring that the required records of Testing & Servicing are
retained,
• Ensuring all relevant staff are trained to use the system,
• Ensuring that records are updated to reflect any changes
made to the system.
7.8.2 Routine Testing
7.8.2.1 Daily Check - Fault Indicators
If the Care2 Console is located in a position where the audible
fault warning could be unnoticed for more than 24 hours, a
special check should be performed each day to confirm that either
the “System Healthy” LED is illuminated, or any faults that are
indicated are receiving necessary attention.
N
OTE
: This Check only needs to be performed if the Warning Buzzer may
go unheard for 24 hours.
This inspection does not need to be recorded.
Содержание Care2
Страница 10: ...Care2 Installation Instructions x Care2 issue 9 ...
Страница 20: ...Care2 Installation Instructions 10 Care2 issue 9 ...
Страница 40: ...Care2 Installation Instructions 30 Care2 issue 9 ...
Страница 88: ...Care2 Installation Instructions 78 Care2 issue 9 ...