Care2
Installation Instructions
Care2 issue 9
35
4 Commissioning
The Commissioning Procedure consists of two main sections:
ensuring the Hardware is connected to each Console, and then
using software to configure the Console(s) for correct operation.
4.1 B
ASIC
H
ARDWARE
C
OMMISSIONING
P
ROCEDURE
1. Fit the C2CEK4 Line Cards, C2CFPE Fire Panel Interface &
C2CN Network card if required.
Refer to Section 2.2, Section 2.3 and Section 2.4 (page 13 -
page 23) for installation details.
2. Connect the Outstations to the Line Cards (see Section 2.1.2
on page 12).
N
OTE
: Do not connect the Site Network cables at this time.
3. Apply Power using either Mains or the internal Batteries.
4. Clear Device Assignments (see Section 7.6 on page 81).
5. While the Control Panel is booting up, initiate the Internal
Device Detection procedure (see Section 4.4 on page 43)
and ensure it is successful.
Содержание Care2
Страница 10: ...Care2 Installation Instructions x Care2 issue 9 ...
Страница 20: ...Care2 Installation Instructions 10 Care2 issue 9 ...
Страница 40: ...Care2 Installation Instructions 30 Care2 issue 9 ...
Страница 88: ...Care2 Installation Instructions 78 Care2 issue 9 ...