
54464_02-97_A
RED AC
WHT AC
J
5
3
J23
J19
J43
J48
K12
U4
J
5
0
J
5
2
BLK AC
J66
J6
5
J63
J64
J42
J
5
4
J
5
6
J
55
J2
5
J
5
7
J26
TB1
CLASS G
FUSE 30A
C
LA
SS
G
F
US
E 30A
F6
F7
F4
K4
W1
F2
K7
T1
HTR2
HTR1
FUSE
0.3A 2
5
0V
K6
K8
G
R
B
W
J79
J
J46
J4
5
J81
12VAC
ADCM
J37
J37
J4
J7J7
J74
W8
1
2
3
FUSE
3A 2
5
0V
TORQUE
RANGE
FOR TB1:
27-30 IN. LBS.
HOT
BLA
C
K
NEUTRAL
WHITE
H
OT
R
ED
Balboa
J11
J11
J8
J8
BARCODE
G
R
B
W
W
W
J12
J14
W
13
W
12
K13
W
2
0
W1
5
BALBOA INSTRUMENTS, INC. MADE IN U.S.A.
EL2000 TC MACH III COPYRIGHT 200
5
P/N 22896 REV B
K
10
J2
MAIN
PANEL
MAIN
PANEL
MAIN
PANEL
AUX
PANEL
AUX
PANEL
J9
J
5
J6
K3
J3
K2
W2
F
5
W9
W7
REMOTE
K11
K9
J1
K1
G
R
B
W
G
R
B
W
G
R
B
W
J86
J80
J60
J60
J6
9
J2
0
J1
0
FUSE 10A 2
5
0V
J39
J7
1
J7
0
J98J98
J89
J91
J1
7
J1
5
J13
J83
J22
J24
J8
2
J3
6
TST
SENS. A
SENS. B VAC
EXT. 2SP PUMP 3
EXT. RLY
AUX. F
J72
CFG
SWITCHBANK A
SWITCHBANK B
J90
J977
G
R
B
W
J8
5
J8
5
J8
5
G
R
B
W
J6
J3
J2
W12
K1
F10A 2
5
0V
F
5
X-B
PN 53310
Blower
RT
C
Enabled
4.0 kW
A.V.
Use AUX Board
for Blower
With 2-Speed P2
Use X-B Expander
for Blower
With 2-Speed P2
2-Spd P2
Ozone
C
irc.Pump
12V Light
Spa
Light
2-Spd P1
Wiring Configuration and DIP Settings
Setup 1 (As Manufactured)
• 240V Pump 1, 2-Speed
• 240V Pump 2, 2-Speed
• 240V Blower
• 240V Circ Pump
• 120V Ozone
• 12V Spa Light
• 120V Audio\Visual (Stereo)
• 240V 4.0kW Heater
• ML900, ML700, or ML400 Main Panel
120 Volt Connections
240 Volt Connections
Black AC Jumpers
12 Volt Connections
Relay Control Wires
Wiring Color Key
Typically Line voltage
Typically Line voltage for 2-speed pumps
Neutral (Common)
Ground
Note flat sides in connector
Connector Key
WARNING:
Main Power to system should be turned OFF BEFORE adjusting DIP switches.
WARNING:
Persistent Memory (A12) must be RESET to allow new DIP switch settings to take effect. (See Persistent Memory page)
Switchbank A
Switchbank B
A2, Low Amp
A5, Degrees F
A6, Short Timeouts
A9/A10,
No Circ Pump
A9/A10,
No Circ Pump
A1, Test Mode OFF
A3, Filter by Time
A4, 12 Hr Time
A7, Cleanup Cycle OFF
A8, 1Hr O3 Supress OFF
A12, Memory Retained
B1, Pump 2 2-Speed
B2, Pump 2 Disabled
B3, Blower Disabled
B4, No Fiber/Wheel
B5, Pump 3 Disabled
B6, Panel Scrunching OFF
100
114
28
SSID #
J37
3
2
1
12 V
Light
J91
RTC
Enabled
(Not Jumpered)
B3, Blower Enabled
B2, Pump 2 Enabled
A11, O3 w/ P1 Low
and P1 is 2-Spd
A2, High Amp
J15
J83
J22
AUX.F
SENS. A
TST
CFG
When the Logic Jumper is not installed on J83 (CFG),
DIP Switch Settings are enabled.
DIP Switches will then operate as shown below.