background image

FOR USE ON ALL RECREATIONAL VEHICLES

28240

RETRACT-A-SPARE TIRE CARRIER

IMPORTANT: READ THE FOLLOWING INFORMATION BEFORE OPERATING THIS PRODUCT!

R V   P R O D U C T S   G R O U P

®

TOOLS NEEDED:

9/16” Socket or Ratchet Wrench

9/16” Open End Wrench

3/8” or 1/2” Power Drill

1/4” and 3/8” Drill Bit

WARNING: 

BEFORE DRILLING HOLES INTO THE FRAME, BE SURE THERE ARE NO ITEMS THE DRILL BIT WILL DAMAGE (i.e.: electrical 

or LP lines, braking or towing related items, holding or water tanks, etc.). IT MAY BE NECESSARY TO LOWER UNDERBELLY SHEET TO 

ACCESS FRAME FOR INSPECTION AND INSTALLATION. ALSO CHECK WITH THE RV MANUFACTURER OR SELLING DEALER TO MAKE SURE 

NO WARRANTIES ARE AFFECTED BY DRILLING INTO THE TRAILER FRAME. BAL WARRANTIES ARE LIMITED TO PRODUCTS ONLY USED FOR 

THEIR DESIGNED AND INTENEDED USE. ANY ABUSE OR MISUSE IS THE LIABLITY OF THE OWNER AND/OR INSTALLER.

This product will mount on trailer frames 52” to 72” wide (side to side). The closer the carrier can be mounted to 

the frame, the less chance of ground clearance issues. There will need to be unobstructed space side to side on the 

bottom of trailer frame for the carrier to install correctly

STEP 1:

 Park and level your travel trailer or fifth-wheel trailer. Prevent wheels from rolling by using tire chocks.

STEP 2:

 Install the Support Wings before mounting to the frame. Using the 3/8” x 7/8” L bolts and 3/8” Nylon nuts, 

mount each Support Wing to the two sets of predrilled holes on the Main Carrier Assy. Securely tighten each bolt to 

20 lb ft torque.

STEP 3:

  Determine a location on the trailer frame to mount the carrier considering warnings and location suggestions 

above. The location should allow easy access to drive nut.

STEP 4:

 After identifying the desired location on the frame; use the frame bracket (on either side of the carrier) as 

a template by marking the center of the two holes with a marker that can be easily seen. Once marked, drill a pilot 

hole using a 1/4” drill bit and then a 3/8“ drill bit to finish enlarging each hole. Using two 3/8” x 1 1/4” L bolts and 3/8” 

Nylon nuts, loosely tighten to secure one side of the carrier in place. 

STEP 5:

 Repeat Step 3 on the opposite side of the frame. Be sure that the location on the opposite side is exactly 

parallel to the location in Step 3. Slide the Main Carrier Assy together with the Telescopic Channel to help determine 

this location.

STEP 6:

 Once each side is loosely attached to the frame, you will need to drill a 1/4” pilot hole thru the predrilled 

center hole in the Telescopic Channel. This hole is located on the Telescopic Channel however you will be drilling into 

the Main Carrier Assy. This is a pass thru hole so you will need to drill the 1/4” pilot hole on each side. Using a 3/8” 

drill bit, enlarge the hole on each side of the carrier. Using the 3/8” x 2 1/2” L bolt and 3/8” Nylon nut, tighten to 23 lb 

ft torque to secure the Main Carrier Assy to the Telescopic Channel. 

STEP 7:

 Securely tighten the four bolts holding the carrier to the frame (two on each side of frame) to 20 lb ft torque.

DETERMINING CORRECT MOUNTING LOCATION

INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Отзывы: