
36 | Baker Hughes.
© 2021 Baker Hughes Company. All rights reserved.
3.6 Wiring the SVI3
The procedure below outlines wiring the SVI3.
3.6.1 Required Practices for Explosion Proof Installations
Please refer ES-817 Product safety manual for required practices for explosion proof
Installations.
.
3.6.2 Wiring Guidelines
Guidelines for a successful implementation of DC current signal, DC power, and HART
®
communication to the SVI3:
• Compliance voltage at the SVI3 is approximately 9 V at 20 mA, 11 V @ 4 mA. See
“Split Range Applications” on page 114.
• Signal to the SVI3 must be a regulated current in the range 3.2 to 22 mA.
• Controller output circuit must be unaffected by the HART
®
tones which are in the
frequency range between 1200 and 2200 Hz.
• In the frequency range of the HART
®
tones, the controller must have a circuit
impedance of more than 220 Ohms, typically 250 Ohms.
• HART
®
tones may be imposed by the positioner and a communication device
located anywhere on the signaling circuit.
• Cabling must be shielded to prevent electrical noise that would interfere with the
HART
®
tones, with the shield grounded.
• Shield must be properly grounded in only one place.
• For details and calculation methods for wiring resistance, and capacitance and for
calculation of cable characteristics, refer to the HART
®
FSK Physical Layer
Specification.
• For split range installations, the output voltage must be sufficient to operate two
positioners (11 V @ 4 mA, 9 V @ 20 mA) and the expected voltage drop in the
cable.
• Use of a low impedance voltage source damages the SVI3. The current source
must be a true high impedance current limiting device. A proper current source
explicitly enables adjustment of the current, not the voltage.
WARNING
• There can be unexpected valve, actuator or positioner movement at any
time during installation or operation.
• Comply with current national and local regulations for electrical installation
work.
• Comply with national and local explosive atmosphere regulations.
• Before carrying out any work on the device, power off the instrument or
make sure that the local conditions for potentially explosive atmosphere
permit the safe opening of the cover.
Содержание Masoneilan SVI3
Страница 14: ...This page intentionally left blank 14 Baker Hughes 2021 Baker Hughes Company All rights reserved...
Страница 72: ...This page intentionally left blank 72 Baker Hughes 2021 Baker Hughes Company All rights reserved...
Страница 88: ...This page intentionally left blank 88 Baker Hughes 2021 Baker Hughes Company All rights reserved...
Страница 122: ...This page intentionally left blank 122 Baker Hughes 2021 Baker Hughes Company All rights reserved...