© 2018 Baker Hughes, a GE company, LLC. All rights reserved.
Masoneilan SVI II ESD Quick Start Guide
=
|
33
Dismantling the SVI II ESD from Reciprocating Valves
WARNING
Before carrying out any work on the device, power off the
instrument or ensure that the local conditions for potentially
explosive atmosphere permit the safe opening of the cover.
To remove the SVI II ESD PST Controller from a reciprocating valve perform Steps 1 - 12 on
page 30 in the reverse order.
Checking the Magnet
There are two methods of checking the SVI II ESD magnet:
Perform a visual inspection
Use ValVue ESD to check the magnet
Performing a Visual Inspection
To perform a visual inspection refer to Table 2 on page 27 and ensure that the magnet is correct-
ly oriented for the actuator/valve configuration.
Using ValVue* ESD to Check Magnet Position
Use this procedure to check the magnet using ValVue ESD (provided with SVI II ESD). Also refer to
Table 2 on page 27 for sensor information.
1. Connect to the PST Controller in accordance with the ValVue ESD instructions. For
further information refer to the ValVue ESD On Line Help or Instruction Manual.
2. After the PST Controller has been installed and set up with a HART
®
Modem in a
HART
®
compliant communications loop, install ValVue ESD on the computer that
is connected to the HART
®
modem.
3. Run ValVue ESD.
4. Select the installed ESD PST Controller from the list of
Connected Devices
as shown
in Figure 10 and click
Connect
.
5. Select the
Check
tab to view the current operating conditions of the selected PST
Controller.
6. Read
Raw Position Data
on the
Check
screen (Figure 10).
Содержание Masoneilan SVI II ESD
Страница 4: ...This page intentionally left blank...
Страница 8: ...This page intentionally left blank...
Страница 20: ...This page intentionally left blank...
Страница 72: ...This page intentionally left blank...
Страница 92: ...This page intentionally left blank...