4. Adjustment 

The air valve is normally factory set and does not require adjustment. 
If it becomes necessary to

 adjust set pressure: 

A)

  Turn adjusting screw (19) to relieve range spring (23) of air valve from compression.  

B)

  Connect  air  supply 

to  “IN”  of  body  to  check  for  closing  and  opening  of  body,  then  connect 

pressure gauge and pressure regulator to the signal pressure connection "SIG IN". 

C)

  Turn on air supply pressure and adjust the pressure regulator to set the pressure at a desired 

value, 

observing the  air  supply  pressure  to “SIG  IN”  on  the  pressure  gauge.    Then  turn  the 

adjusting  screw  clockwise  until  there  is  no  air  leak  from  "OUT"  of  body.  At  this  point,  the  air 
valve has its "IN" closed and "OUT" and "EHX" communicated.  

D)

  Finally, tighten adjusting screw locknut (20) and connect the air valve outlet and "OUT" to the 

actuator and the signal pressure line to the supply pressure.  

 

5. Maintenance 

If the air valve does not operate properly, inspect it as follows.  

A)  Shut off the supply pressure  

B)  Return the adjusting screw to its former position and loosen the spring.  

Disassembling Procedure 

Remove  four  screws  (25)  and  remove  O-Ring  (15),  housing  S/A,  range  spring  (23),  spring  button 
(17) and spring case (18) from body (1).  

For housing (2), diaphragm S/A (16) and pilot valve (6) can be removed by loosening nut (21) and 
pilot retainer (7) respectively.  

To disassemble body S/A, first remove bottom cap (26), take out spring (9), remove nut (24) on the 
underside of plug S/A and pull out spring washer (22), insert retainer (5) and rubber insert (8).  

After  that,  push  up  the  bottom  or  plug  (3)  to  remove  piston  (4)  and  rubber  insert  (8)  together  with 
plug. 

Inspection should be made in the following way: 

First examine diaphragm (16) for rupture and damaged edge. Inspect the seat of pilot valve (6) for 
dust  and  damage.  Also  inspect  O-rings  (13)  and  (14).  Replace  all  of  these  parts  by  new  ones  if 
necessary.  For  the  valve  body,  inspect  O-rings  (10),  (11),  (12)  and  (15)  and  rubber  insert  (8). 
Replace them with new ones if necessary. 

Check the valve seat for dust and clean it.  

 

6. Reassembly 

Reverse the disassembly procedure. Before setting to reassembly, apply silicon grease to O-rings. 
Do not fail to use a new shim (27).  
 

 

 

 

 

 

 

 

Содержание Masoneilan 77-80H Series

Страница 1: ...Baker Hughes Data Classification Public Masoneilan 77 80H 00 80H Series Air Valve Instruction Manual Rev A...

Страница 2: ...REQUIREMENTS FOR OPERATION OF OTHER EQUIPMENT AT THE SITE THESE INSTRUCTIONS DO NOT PURPORT TO COVER ALL DETAILS OR VARIATIONS IN EQUIPMENT NOR TO PROVIDE FOR EVERY POSSIBLE CONTINGENCY TO BE MET IN...

Страница 3: ...without prior notice The information contained in this manual in whole or part shall not be transcribed or copied without Baker Hughes s written permission Please report any errors or questions about...

Страница 4: ...he equipment otherwise it may cause malfunction of the valve Air Source Use clear air Do not use compressed air that contains chemicals synthetic oil based on organic solvents or corrosive gas or othe...

Страница 5: ...ve controller or any other equipment will not operate suddenly Gradually extract the pressure of air in all the operating lines and disconnect the operating lines only after the air is entirely extrac...

Страница 6: ...__________________________________________ 7 2 Specification __________________________________________ 7 3 Installation____________________________________________ 7 5 Maintenance ___________________...

Страница 7: ...Port Rc1 4 NPT Operating Temperature Range 30 to 70 18 to 100 C High Temp 49 to 80 C Low Temp Housing Material Aluminum Alloy 3 Installation Prior to installing clean all lines thoroughly to remove a...

Страница 8: ...as follows A Shut off the supply pressure B Return the adjusting screw to its former position and loosen the spring Disassembling Procedure Remove four screws 25 and remove O Ring 15 housing S A rang...

Страница 9: ...ny All rights reserved Masoneilan 77 80H 00 80H Air Valve Instruction Manual 9 INLET PRESSURE 880 kPaG 125 psiG SET RANGE 35 700 kPaG 5 100 psiG Rc1 4 NPT1 4 SIGNAL Rc1 2 NPT1 2 EXHAUST Rc1 2 NPT1 2 O...

Страница 10: ...r Hughes 2021 Baker Hughes Company All rights reserved INLET PRESSURE 880 kPaG 125 psiG SIGNAL PRESSURE 35 700 kPaG 5 100 psiG Rc1 4 NPT1 4 SIGNAL Rc1 2 NPT1 2 EXHAUST Rc1 2 NPT1 2 OUTLET Rc1 2 NPT1 2...

Страница 11: ...hughes com Copyright 2021 Baker Hughes Company All rights reserved Baker Hughes provides this information on an as is basis for general information purposes Baker Hughes does not make any representati...

Отзывы: