12
12
MOUNTING AND ASSEMBLY
1. Determine the most suitable location for your
machine based on the planned usage. Larger
workpieces will require a larger space around the
machine.
2. Consider placing this machine on an industrial
grade floor mat to reduce vibration.
3. Check the oil level in the air lubricator. If the oil
level is low, refill with an SAE 10-weight non-
detergent, non-additive oil.
4. Install a male 1/4” NPT quick connector fitting into
the air inlet of the filter/regulator.
SETUP
Set up involves installing the tooling, setting the gap
between the anvil and the hammer head, setting the
air pressure, positioning the foot pedal in a
comfortable position for the operation of the machine.
Tooling Installation
1. Lift the quick release handle (A) to raise the
hammer head.
2. Loosen the two clamping block bolts (B).
3. If needed, lower the anvil ram to allow for
clearance to insert the upper tool (C) into the
hammer head.
4. Align the index slot on the tool to the hammer
head and hold the fully upward and tighten the
two clamping bolts (B).
5. Insert the lower die (D) into the anvil ram and
align the die with the pin holes and install the lock
pin (D).
6. Pull forward on the quick release handle (A) to
lower the hammer head to the anvil.
7. Set the tooling clearance.
A
D
E
C
B
Содержание PH-28A
Страница 18: ...16 16 PARTS DIAGRAM ...
Страница 19: ...17 17 FRAME ...
Страница 20: ...18 18 PNEUMATICS ...
Страница 21: ...19 19 ANVIL RAM ...
Страница 22: ...20 20 QUICK RELEASE ...
Страница 23: ...21 21 HAMMER HEAD PRE 2018 ...
Страница 27: ...25 25 NOTES ...