background image

 

 

INTRODUCTION 

 

The  quality  and  reliability  of  the  components  assembled  on  a  Baileigh  Industrial  machine 
guarantee  near  perfect  functioning,  free  from  problems,  even  under  the  most  demanding 
working conditions. However if a situation arises, refer to the manual first. If a solution cannot be 
found, contact the distributor where you purchased our product. Make sure you have the serial 
number and production year of the machine (stamped on the nameplate). For replacement parts 
refer to the assembly numbers on the parts list drawings. 

 

Our technical staff will do their best to help you get your machine back in working order. 

 

In this manual you will find:  (when applicable) 

 

Safety procedures 

 

Correct installation guidelines 

 

Description of the functional parts of the machine 

 

Capacity charts 

 

Set-up and start-up instructions 

 

Machine operation 

 

Scheduled maintenance 

 

Parts lists 

 

GENERAL NOTES 

 
After receiving your equipment remove the protective container. Do a complete visual 
inspection, and if damage is noted, 

photograph it for insurance claims 

and contact your 

carrier at once, requesting inspection. Also contact Baileigh Industrial and inform them of the 
unexpected occurrence. Temporarily suspend installation. 
 
Take necessary precautions while loading / unloading or moving the machine to avoid any 
injuries. 
 
Your machine is designed and manufactured to work smoothly and efficiently. Following proper 
maintenance instructions will help ensure this. Try and use original spare parts, whenever 
possible, and most importantly; 

DO NOT

 overload the machine or make any unauthorized 

modifications. 
 

 

Note: 

This symbol refers to useful information throughout the manual. 

Содержание MSS-16F

Страница 1: ...L INC IS PROHIBITED Baileigh Industrial Inc does not assume and hereby disclaims any liability for any damage or loss caused by an omission or error in this Operator s Manual resulting from accident n...

Страница 2: ...GENERAL NOTES 3 SAFETY INSTRUCTIONS 4 SAFETY PRECAUTIONS 5 TECHNICAL SPECIFICATIONS 7 TECHNICAL SUPPORT 7 UNPACKING AND CHECKING CONTENTS 8 Cleaning 8 INSTALLATION 9 ASSEMBLY AND SET UP 10 OPERATION 1...

Страница 3: ...e to Seller of any suspected defect in the Goods prior to the expiration of the warranty period The original end user must also obtain a RGA from Seller prior to returning any Goods to Seller for warr...

Страница 4: ...urther remedies provided under this Agreement or at law or equity Attorney s Fees In the event legal action is necessary to recover monies due from Buyer or to enforce any provision of this Agreement...

Страница 5: ...tion of the functional parts of the machine Capacity charts Set up and start up instructions Machine operation Scheduled maintenance Parts lists GENERAL NOTES After receiving your equipment remove the...

Страница 6: ...es a hazard or unsafe practice that will result in severe Injury or Death Safety signs with signal word DANGER or WARNING are typically near specific hazards General precautions are listed on CAUTION...

Страница 7: ...us if safe and proper operating procedures are not followed As with all machinery there are certain hazards involved with the operation of the product Using the machine with respect and caution will c...

Страница 8: ...recommended when using machinery Wear a restrictive hair covering to contain long hair 10 Use eye and ear protection Always wear ISO approved impact safety goggles Wear a full face shield if you are p...

Страница 9: ...n this manual are representative only and may not depict the actual color labeling or accessories and may be intended to illustrate technique only Note The specifications and dimensions presented here...

Страница 10: ...ing use a degreaser or solvent cleaner For a more thorough cleaning some parts will occasionally have to be removed DO NOT USE acetone or brake cleaner as they may damage painted surfaces Follow manuf...

Страница 11: ...commended that you mount your new machine to the floor Because flooring material may vary floor mounting hardware is not included Generally you can either bolt your machine to the floor or mount it on...

Страница 12: ...M10 screws 3 Place the foot pedal into the base Make sure the threaded link screw is pointing up and into the main unit 4 Move the foot pedal in to the main unit and at the same time with your other h...

Страница 13: ...s 7 Mount the spring first into the main unit then to the foot pedal 8 Grease the foot pedal axle and install the axle in the hole in the end of the foot pedal 9 Mount the foot pedal link and the axle...

Страница 14: ...crew it in about 15 turns 11 The length of the link has to be adjusted so that the height of the low side of the foot pedal is 7 5 5 190 5mm 12 7mm Place a 7 5 190 5mm block under the foot pedal and a...

Страница 15: ...12 Install the two 2 M8 screws for the upper link and tighten 13 Mount the jaws by first installing the screws into the jaw 14 Place the jaws one at a time with the text to the outside Then tighten th...

Страница 16: ...ve the text in the same direction Best results are text to the outside 16 On the shrinker jaws the openings have to be placed forward 17 Oil the jaws every week depending on usage 18 When the machine...

Страница 17: ...rface so it processes easily Dimensional properties of material must be consistent and not exceed the machine capacity values Chemical structure of material must be consistent Buy certificated steel f...

Страница 18: ...16 16 PARTS DIAGRAM...

Страница 19: ...Spring 1 11 Die Frame 2 38 Screw M10 x 16 2 12 Spring 2 39 Axle 1 13 Roll Pin 3 x 30 2 40 Hanging Chain 1 14 Side Plate Big Axle 2 40 1 Split Pin 3 2 x 25 2 15 Washer 2 41 Screw M10 x 20 4 16 Screw M...

Страница 20: ...1455 S CAMPUS AVENUE ONTARIO CA 91761 PHONE 920 684 4990 FAX 920 684 3944 BAILEIGH INDUSTRIAL LTD UNIT 1 FULLWOOD CLOSE ALDERMANS GREEN INDUSTRIAL ESTATE COVENTRY CV2 2SS UNITED KINGDOM PHONE 44 0 24...

Отзывы: