24V 50VA Motor control box -
Version 1.0
Instruction Manual
13/20
6
Initial operation
w w w .b ai e r- g mb h .d e
6
Initial operation
After installation of the control device, an initial operation must be performed.
The following sections describe the parts of the control device, which are relevant
for the initial operation. The following chapters describe step by step, which
functions must be set up and how the initial operation is done.
Configuration switch
LED „Configuration“
-
+
Figure 2
Service elements
Reset key
Service key „Close“ (ZU)
Service key „Open“ (AUF)
Potentiometer
P1 and P2
LED „Close“
LED „Open“
LED „24V OK“