background image

 

 

Nova430e

   

Outdoor 4x250mW   
Two-Carrier 
TDD eNodeB   

Installation Guide 

QRTB 2.9.4 

 

 

March 2022 

Version 1.01 

Содержание Nova430e

Страница 1: ...Nova430e Outdoor 4x250mW Two Carrier TDD eNodeB Installation Guide QRTB 2 9 4 March 2022 Version 1 01...

Страница 2: ...Baicells com Resources Documents Copyright Notice Baicells Technologies Inc copyrights the information in this document No part of this document may be reproduced inany form or means without the prio...

Страница 3: ...s warning symbol means danger You are in a situation that could cause bodily injury Before you work on any equipment be aware of the hazards involved with electrical circuitry and be familiar with sta...

Страница 4: ...1 Install on Pole 17 3 3 2 Install on Wall 19 3 4 Connect Cables 20 3 4 1 Cable Laying Requirements 20 3 4 2 Connect RF Cables 21 3 4 3 Connect Ethernet Cable 21 3 4 4 eNB Grounding 21 3 4 5 Connect...

Страница 5: ...ation Process Overview 15 Figure 3 2 GPS Installation Requirements 16 Figure 3 3 GPS Antenna Installation 17 Figure 3 4 Omega Clamps 17 Figure 3 5 Attach Bracket to Pole 18 Figure 3 6 Attach eNB to Br...

Страница 6: ...36 Figure 3 25 Reboot 37 Figure 3 26 Cell Status eNB GUI 38 Figure 3 27 Cell Status OMC 38 Figure 3 28 OMC eNB Monitor Display Settings 39 List of Tables Table 2 1 Materials 11 Table 2 2 Installation...

Страница 7: ...B can operate in Carrier Aggregation CA mode or Dual Carrier DC split mode The Nova430e supports broadband data access providing various data service transformation and transmission capabilities to en...

Страница 8: ...t mode based on software license HaloB mode embedded in the base software Citizens Broadband Radio System CBRS Spectrum Access System SAS SC describes a scenario where the operator wishes to use only...

Страница 9: ...MHz bandwidth per carrier Provides excellent Non Line of Sight NLOS coverage Peak rate is a configurable parameter using special Subframe Assignment SA o 2x20 MHz per carrier SA1 DL 80 Mbps UL 28 Mbps...

Страница 10: ...Server DNS Client and Network Access Translation NAT functionality providing strong high speed routing Supports Transparent Bridge Mode 2 Installation Preparation 2 1 Materials Check the Nova430e pac...

Страница 11: ...antenna Ethernet cable Outdoor CAT6 shorter than 109 yards 100 meters It is suggested that the diameter of the cable is 7 mm 1 mm Ground cable If the length of lead is more than 11 yards 10 meters 6...

Страница 12: ...s Description PWR Green Steady on Power is on OFF No power supply CELL1 Green OFF CELL1 is inactive Fast flash 0 1 s on 0 1 s off CELL1 is deactivated Slow flash 1 s on 1 s off CELL2 is activated CELL...

Страница 13: ...explosives or electromagnetic interference e g large radar stations transformer substations Avoid areas prone to impounded water soaking leakage or condensation Environmental specifications are shown...

Страница 14: ...2 Tighten the connector 3 Push the cold shrink tube to the top joint and pull out the strip 4 Ensure the cold shrink tube is tightly fitted with the connection Figure 2 3 Weatherproofing For GPS anten...

Страница 15: ...elow Step 1 Open a web browser and enter the CloudCore address Figure 2 5 https cloudcore cloudapp net cloudcore Step 2 Click on the Sign up button Step 3 Complete the mandatory fields and again click...

Страница 16: ...receiving equipment to avoid interference Do not install it under a microwave antenna or high voltage cable Avoid the direction of radiation from other transmitting antennas to the GPS antenna When t...

Страница 17: ...er of the pole is in the range of 1 6 2 8 in 40 70 mm The position of the eNB on the pole should be at least 47 in 120 cm in height Follow the steps below to install the eNB on a pole 1 Unscrew the fo...

Страница 18: ...eNB to the mounting bracket on the pole Push the eNB until the hook is firmly attached to the mounting bracket Figure 3 6 Figure 3 6 Attach eNB to Bracket 4 Tighten the bolt on the top of the bracket...

Страница 19: ...Place the assembled bracket on the wall with the arrow facing upward as shown in Figure 3 8 Mark the drilling locations using a pencil or marker 3 Drill two holes in the wall to match the size of the...

Страница 20: ...enna feeder cable 7 8 in 9 84 in 250 mm 4 5 in 14 96 in 380 mm Bending radius of jumper cable 1 4 in 1 38 in 35 mm 1 2 in super soft 1 97 in 50 mm 1 2 in ordinary 5 in 127 mm Bending radius of power c...

Страница 21: ...3 4 3 Connect Ethernet Cable 1 Connect the Ethernet cable to the ETH interface in the wiring cavity 2 Lay the Ethernet cable along the wire groove and stretch out the wiring cavity from ETH hole 3 The...

Страница 22: ...3 m 4 The copper bar must be used for the grounding bar and the specification of the grounding bar shall meet the design requirements If there are no specific requirements in the design 300 40 4 mm a...

Страница 23: ...tly and the grounding bar must have a path from the lead to the earth 3 4 5 Connect Grounding Cable Prepare the grounding cable according to the actual measurements and requirements of the specific in...

Страница 24: ...omplete you must close the maintenance chamber of the equipment and waterproof the chamber Put the Ethernet cable on the wire and seal the wire diameter 7 mm 1 mm 3 6 Power on to Check LED Status WARN...

Страница 25: ...to the following documents on the Baicells website Baicells com Resources Documents CloudCore Configuration Network Administration Guide OMC BOSS CPE Configuration Guide eNodeB Configuration Guide Car...

Страница 26: ...Home Page Optionally you may want to 1 Change the login password 2 Confirm the firmware version is the latest available from Baicells website upgrade if needed Firmware upgrades can be found at Baice...

Страница 27: ...6 The base station reboots after approximately three minutes 7 On the Basic Setting Basic Info page the upgraded version is displayed in Software Version 3 7 2 2 Upgrade Firmware from the OMC 1 Go to...

Страница 28: ...ion between the eNB Network Management System NMS in most cases the CloudCore OMC and the Mobility Management Entity MME If not using CloudCore the eNB NMS may be a Local OMC or the LTE NMS The WAN LA...

Страница 29: ...29 NOTE If the LAN IP address is changed the eNB will reboot and you will have to log in to the GUI again Figure 3 18 WAN LAN VLAN...

Страница 30: ...e desired interface protocol DHCP Static IP IPv6 DHCP or IPv6 Static IP Current IP The WAN interface IP address Option60 Used to differentiate between different terminal when IP Access Mode is set to...

Страница 31: ...t IP address is 10 10 10 1 and the netmask is 255 255 255 0 the IP address pool includes 255 IP addresses The options are shown in the pull down menu Static Address If LGW Mode Router Figure 3 20 set...

Страница 32: ...ig andValidated Route List Figure 3 21 The configuredstatic route information will be displayed under Static Routing Config To edit a static route in the list click on the edit icon enter the informat...

Страница 33: ...re the Management Server In the BTS Setting Management Server window you will enter the network management service NMS information Figure 3 22 When using the Baicells CloudCore to manage the network i...

Страница 34: ...rt Contact Location Community String Source Trap Agent Configuration Option available when SNMP option is enabled Trap Community String Trap Server 3 7 6 Configure Quick Settings Under the Basic Setti...

Страница 35: ...will determine some of these parameters Refer to the SAS Deployment Guide for more information NOTE 2 Nova430e does not support SFA 0 For a description of all the eNB Quick Setting fields refer to the...

Страница 36: ...RF ports instead of four Operators may need to use this mode if they have limited spectrum or are planning to change to CA or DC mode at a later time when more capacity is needed for the coverage are...

Страница 37: ...us settings eNB GUI Go to Basic Setting Basic Info and check the Cell Status field Figure 3 26 It should show Active Also check that GPS Sync is reported as Synchronized OMC Go to eNB Monitor to see i...

Страница 38: ...38 Figure 3 26 Cell Status eNB GUI Figure 3 27 Cell Status OMC...

Страница 39: ...Settings Before commercial operation Baicells recommends implementing cell site acceptance testing of a new site to ensure the service meets expectations to document network speeds at various location...

Страница 40: ...communications Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense WARNING...

Отзывы: