Meter installation
Page 30
LM_OGP2Adv_BA_99_0045
May 2019
5.
METER INSTALLATION
5.1
Relieve system pressure
1.
Turn off the power supply to the pump or close the shutoff valve.
2.
Dispense any fluid in the system into a waste container by opening the meter(s).
3.
Open all bleed-type master air valves and fluid meter(s) in the system.
4.
Leave the meter(s) open until ready to pressurize the system.
PRESSURIZED EQUIPMENT
This equipment stays pressurized until the pressure is manually relieved. To reduce the risk of injury from fluid spray from the
meter follow the pressure relief procedures when you
•
are instructed to relieve pressure
•
stop dispensing
•
check, clean or service any system equipment
•
clean or install nozzles
5.2
Grounding
Grounding reduces the risk of static sparking. Ground all system components according to local, state, and federal codes.
Consult the pump user's manual and other system components to ground the following:
1.
Pump: follow manufacturer's recommendations
2.
Air and Fluid Hoses: use only grounded hoses
3.
Air Compressor: follow manufacturers recommendations
4.
Fluid Supply Container: follow the local code
EXPLOSION AND FIRE
Movement of fluids through the dispensing system creates static electricity. Static electricity can cause volatile fumes
resulting in an explosion and fire. The dispensing system must be grounded.