Digital Flow Monitors
Service Kits for B2900 Battery-Powered Monitor
DSY-UM-02594-EN-04 (April 2021)
User Manual
Страница 1: ...Digital Flow Monitors Service Kits for B2900 Battery Powered Monitor DSY UM 02594 EN 04 April 2021 User Manual...
Страница 2: ...TENTS Scope of This Manual 3 Unpacking and Inspection 3 Safety 3 Electrical Symbols 4 Service Kit Parts Installation 4 Service Kits for B2900 Battery Powered Monitor Page ii April 2021 DSY UM 02594 EN...
Страница 3: ...tches loose or broken parts or any other sign of damage that may have occurred during shipment OTE N If damage is found request an inspection by the carrier s agent within 48 hours of delivery and fil...
Страница 4: ...ns One programmed PCB assembly Four screws Phillips pan head 4 1 2 zinc steel 1 Loosen the 2 enclosure captive screws and open the cover 2 Remove the four screws holding the board in place 3 Tilt the...
Страница 5: ...e old board 11 Attach the ribbon cable to the J4 connector on the display side of the new board 12 Secure the new board with 4 screws 13 Replace the battery 14 Secure the battery with a tie wrap 15 At...
Страница 6: ...INTENTIONAL BLANK PAGE Service Kits for B2900 Battery Powered Monitor April 2021 DSY UM 02594 EN 04 Page 6...
Страница 7: ...INTENTIONAL BLANK PAGE User Manual April 2021 DSY UM 02594 EN 04 Page 7...
Страница 8: ...n this document are the property of their respective entities Due to continuous research product improvements and enhancements Badger Meter reserves the right to change product or system specification...