Fill Access Platform - PFi Only (Optional)
1. Attach the upper ladder supports LA7 and PGZ to the ladder if not already installed and
then attach the ladder assembly to the platform using the 3/8” x 1 1/4” bolts provided.
See
Figure 40
,
Detail B
.
2. Secure the ladder flares to the platform railing posts using the 5/16” x 3 1/2” bolts
provided. See
Figure 40
,
Detail A
.
3. Install the mid and lower ladder supports per
Figure 40
,
Detail C,
as follows:
–
Loosely assemble the support channels PHE, PHF, PHG and PHD using the 3/8” x
1 1/4” bolts provided and then loosely attach this assembly to the factory installed
channel
–
Attach the support assembly to the ladder with the ladder clamps PDC and PDB
using the 3/8” x 1 1/4” bolts provided.
–
Tighten all hardware to secure the support.
NOTE:
Not all units receive
a mid-support.
Detail B
Figure 40.
Mechanical Access Platform End Ladder – All units