RIGGING AND
INSTALLATION INSTRUCTIONS
1
R_TSU-C/Dv00 EN
TSU-C/D for External Melt
ICE CHILLER
®
Thermal Storage Unit
TSC-C/D for External Melt
ICE CHILLER
®
Thermal Storage Coil only
The BAC equipment should be rigged and installed as
outlined in this bulletin.
These procedures should be thoroughly reviewed prior to
the rigging and operation to acquaint all personnel with
the procedures to be followed and to assure that all
necessary equipment will be available at the jobsite.
Be sure to have a copy of the unit certified drawing
available for reference. If you do not have a copy of this
drawing or if you need additional information about this
unit, contact the local BAC Balticare representative. His
name and phone number can be found on the BAC
website:
. The model type and
serial number of your equipment are indicated on the unit
nameplate.
Table of Contents
Page
General Information
Rigging
Inspection Prior to Start-up
Recommended Maintenance and
Monitoring Programme