Pg. 56
10-9 .
Now that you have your LCD USB Cable
with the right amount of slack, zip tie it to the
zip tie mount, then plug your USB cable into the
QuiltMotion Plate as shown in Fig. 10-K
NOTE:
Keep the zip ties loose enough that the
cord can move freely if needed.
10-10
. Zip tie the Computer USB cable to the last
zip tie mount, but leave the zip tie loose and move
the sewing machine all the way forward and all
the way back. Make sure that the USB Cable does
not drag on the table or interfere with the wheels,
as shown in Fig. 10-L.
10-11 .
There is a ribbon cable that comes with
your Jewel sewing machine that has three end
plugs. Plug one end of the ribbon cable into the
side encoder, as show in Fig. 10-M.
10-12 .
Thread the ribbon cable underneath the
sewing machine and out the other end, as shown
in Fig. 10-N.
10-13 .
Plug the other end of the ribbon cable into
the machine, as shown in Fig. 10-O.
Fig. 10-K
Fig. 10-M
Fig. 10-L
Fig. 10-O
Fig. 10-N
Zip Tie
Содержание BL J18-QM
Страница 1: ...Model BLJ18 QM www babylock com Consumer Helpline 800 264 0644 Installation Guide And...
Страница 3: ...Section 1 The Crown Jewel on the Majestic frame Installation Guide For the On the Majestic frame...
Страница 21: ...Section 2 The Crown Jewel on the Pinnacle frame Installation Guide For the On the Pinnacle frame...
Страница 39: ...Section 3 The Jewel on the Pinnacle frame Installation Guide For the On the Pinnacle frame...
Страница 65: ...Pg 64 20 Now that the program has been registered it will now launch to the QuiltCAD main screen...
Страница 66: ......