![b2 electronic BA60 Скачать руководство пользователя страница 33](http://html1.mh-extra.com/html/b2-electronic/ba60/ba60_user-manual_3133258033.webp)
7 Test Procedure
©
b2 electronic
GmbH
DHV0017 b2 EN
33
7.8
Withstand Test Execution
Step
Procedure
(Withstand Test)
Example
Main Menu
Use the Up / Down arrows to place the cursor on
“Single Test”.
Click “OK”.
Set “Gap” & “Rise”
To set the different options, use “Up / Down” arrows to
place the cursor:
•
Electrode Gap: between 0.5 - 10 mm
•
Time: 10 seconds
–
3 minutes
•
Rise Rate: 0.5
–
10 kV/s
•
max. Voltage: depends on the max. Voltage of
the BA unit
To toggle the value use Left / Right arrows.
To start test, set the cursor on option “Start Test”
NOTICE
At the end of selected time of withstand test,
instrument will rise up to maximum voltage!
Alternative settings
–
please check
operation manual of software
“BA
ControlCenter
”
Before executing an user defined test, the test vessel must be correctly
installed in the test chamber.
The electrode gap spacing and the voltage rate of rise are not assessed
automatically by
the BA instrument. It is the BA operator’s responsibility to
verify that these variables are properly adjusted.
Содержание BA60
Страница 48: ...10 Declaration of Conformity 48 DHV0017 b2 EN b2 electronic GmbH BA60...
Страница 49: ...10 Declaration of Conformity b2 electronic GmbH DHV0017 b2 EN 49 BA75...
Страница 50: ...10 Declaration of Conformity 50 DHV0017 b2 EN b2 electronic GmbH BA80...
Страница 51: ...10 Declaration of Conformity b2 electronic GmbH DHV0017 b2 EN 51 BA100...