7 Test Procedure
©
b2 electronic
GmbH
DHV0017 b2 EN
31
Step
Procedure
(Run Standard Test)
Example
Refill Oil
(according to
ASTM877M-13A
& B)
The test cycle ends.
Until the range and deviation limits satisfy the criteria
of the corresponding standard, the user is prompted to
carry out an additional test cycle.
To continue, refill the test vessel.
Test Result /
End Test
The test cycle ends.
The summary of the test results appear on the screen
and the test report is printed.
Once the test results satisfy the criteria of the
corresponding standard, the test sequence has ended.
To return to the main menu, click „OK“.
7.7
Single Test Execution
Step
Procedure
(Run Single Test)
Example
Main Menu
Use the Up / Down arrows to place the cursor on
“Single Test”.
Click “OK”.
Before executing an user defined test the test vessel must be correctly
installed in the test chamber.
The electrode gap spacing and the voltage rate of rise are not assessed
automatically by
the BA instrument. It is the BA operator’s responsibility
to verify that these variables are properly adjusted.
Содержание BA60
Страница 48: ...10 Declaration of Conformity 48 DHV0017 b2 EN b2 electronic GmbH BA60...
Страница 49: ...10 Declaration of Conformity b2 electronic GmbH DHV0017 b2 EN 49 BA75...
Страница 50: ...10 Declaration of Conformity 50 DHV0017 b2 EN b2 electronic GmbH BA80...
Страница 51: ...10 Declaration of Conformity b2 electronic GmbH DHV0017 b2 EN 51 BA100...