background image

14.  Wiring diagrams with Power 

pack PP-A-J and PP-1-J

Standard mode with Primary/Secondary 

!

   

Secondary sensors and primary sensor must be 

connected to the same power pack.

!

   

Secondary sensors and primary sensor must be 

connected to the same power pack.

B.E.G.

 Controls

 

277 Highway 74 N, Suite 319 

Peachtree City, GA 30269 

Phone: 770-349-6341 

Email: [email protected]

MAN 8

88

7-18

0316_1

Controls

B.E.G.

Hot

White

Black

Neutral

Brown

Orange

Gray

Red

Y / B

Y / R

HVAC 

Load 

PB 

PB  PB 

Power Pack

Switch

PP-A-J

LED Switch

RJ 12

RJ 12

RJ 12

6

S

Secondary

P

Primary

All Off

 HVAC Load 

Red

Red

120 - 277 VAC

24 VDC

max. 200 mA

RJ12 male 

to dual 

RJ12 

female 

splitter

Hot

White

Black

Neutral

Gray

Red

Load 

PB 

Power Pack

Switch

PP-1-J

LED Switch

RJ 12

RJ 12

RJ 12

6

S

Secondary

P

Primary

Load

 

Red

Red

120 - 277 VAC

24 VDC

max. 200 mA

RJ12 male 

to dual 

RJ12 

female 

splitter

Отзывы: