background image

Installation and Operating Instruction for 

B.E.G.

-Occupancy detectors PD2-M-DALI/DSI-SM/-FC and PD4-M-DALI/DSI-SM/-FC

2a.  Installation of the LUXOMAT

®

 PD2/

PD4-M-DALI/DSI-

SM  

2b.  Installation of the LUXOMAT

®

 

PD2/PD4-M-DALI/DSI-FC

LUXOMAT

®

PD2/PD4-M-DALI/DSI

 1b. Mounting preparations 

 

Work on the 230 V mains supply 

may only be carried out by quali-

fied professionals or by instructed 

persons under the direction and 

supervision of qualified skilled elec-

trical personnel in accordance with 

electrotechnical regulations.

 

Disconnect supply before installing! 

 

When in Master/Slave mode of 

operation, the Master-appliance  

must always be installed at the  

location where there is least  

daylight.

 1a.  Features

*  For connection of up to 50 lamps
*  Suitable for dimmable electronic 

ballasts and control modules

* DALI/DSI output
* Constant light control
* Manual switching/dimming
*  Semi or full automatic operation
*  Luminance (brightness) set point, 

switch-off delay time for LIGHT/HVAC 

and orientation-light adjustable

*  Sensor and power sections in one 

housing

* Remote controllable

GB

C

D

68 mm

A circular opening of diameter 68 mm 

must be produced in the ceiling. Having 

connected up the cables in accor dance 

with regulations, the detector is inserted 

into the opening as shown in the drawing 

opposite and fixed into position with the 

assistance of the spring clips.

The detector must be in stalled on a solid and level surface. 

The circular cover ring must be removed prior to assembly. 

To do this, twist the lens (C) of the PD4 or (D) of the PD2 

anticlockwise through approximately 5° and lift off.  

Having connected up the wires in accordance with regula-

tions, secure the detector with 2 screws. After installation 

replace the lens and lock (turn clockwise). Mains to be 

connected

.

close open

5. Putting into operation / Settings

Follow-up time for light control

 The time can be set infinitely variably at between 1 and 30 minutes.  
 Symbol 

TEST

: Test mode (Every movement switches on the light for a period 

of 1 second, switching it off for a period of 2 seconds after that regardless 

of the level of brightness)

Twilight-switch for light control (relay 1)

The switch-on value for the light can be set at between 10 and 2000 Lux. 

Using the rotary control, the luminance set points can be set as desired. 
Symbol  : Night-time operation | Symbol 

: Daytime/Night-time operation

Orientation lighting 

(fixed to 20%)

The orientation lighting can be set infinitely variably at between 5 and 60 

minutes resp. “ON” for permanent orientation lighting or “OFF” for no 

orientation lighting. 

Pulse spacing PD-Slave

2 or 9 seconds can be set for the pause between 2 pulses sent to the 

master.  The setting can be made with activated ( ) or deactivated ( ) 

LED indicator.
For devices with a separate slave input, 2 sec. can be set.

6. Settings carried out using remote control (optional)

Remote control LUXOMAT

®

 IR-PD-DALI

1. Check Battery:

  

open battery compartment by pressing the 

plastic springs together and removing the 

battery-holder.

2.   IMPORTANT 

Please pay attention, that the setting is Potentio-

meter 1 at “TEST” and Potentiometer 2 

not

 at 

“SUN”. All values which have been programmed 

using the remote control will be deleted in the 

event of power failure in the position “TEST/

SUN”. Please switch Potentiometer 2 over to 

“MOON” or any other value.

Caution:

  

Settings with remote control override the  

potentiometer settings.

The product enters an initial 

60-second self-test cycle, when 

the supply is first connected. 

The occupancy detector is 

ready for operation. (red Led 

flashes)

4. Self test cycle

9s

2s

LED ON

LED OFF

DIP 1 =

 without function

DIP 2 =

 without function

DIP 3 =

 without function

3a.  Position DIP-Switches, LEDs and Potentiometer SM

ON

OFF

DIP

1

I

I

I

II

II

III

III

2

II

3

III

3b.  Position DIP-Switches, LEDs and Potentiometer FC

PD2- 

False ceiling  

mounting

PD4- 

False ceiling  

mounting

PD2-

Surface 

mounting

PD4-

Surface 

mounting

Potentiometer  A

 Lux Channel 1

Potentiometer  B

 Time Channel 1

Potentiometer  C

 Orientation lighting

LED I

 green

LED II 

red 

LED III 

white 

The DIP switch settings are 

overriden

 using the 

remote control. 

C

C

B

B

A

A

R1

TE

1

3

6

22

18 16

10

30

25

LUX

40

2000

600

1200

200

R2

A

120

60

5

15

30

40

50

20%

60

5

10

50 30

O

FF

ON

1

1

2

2

R1

TE

1

3

6

22

18 16

10

30

25

LUX

40

2000

600

1200

200

R2

A

120

60

5

15

30

40

50

20%

60

5

10

50 30

O

FF

ON

R1

TE

1

3

6

22

18 16

10

30

25

LUX

40

2000

600

1200

200

R2

A

120

60

5

15

30

40

50

20%

60

5

10

50 30

O

FF

ON

R1

TE

1

3

6

22

18 16

10

30

25

LUX

40

2000

600

1200

200

R2

A

120

60

5

15

30

40

50

20%

60

5

10

50 30

O

FF

ON

R1

TE

1

3

6

22

18 16

10

30

25

LUX

40

2000

600

1200

200

R2

A

120

60

5

15

30

40

50

20%

60

5

10

50 30

O

FF

ON

LUX

40

2000

600

1200

200

R1

TE

1

3

6

22

18 16

10

30

25

LUX

40

2000

600

1200

200

R2

A

120

60

5

15

30

40

50

20%

60

5

10

50 30

O

FF

ON

III II I

ON

OFF

DIP

      

Light  

measurement

Light  

measurement

1

2

3

Light  

measurement

C

C

B

B

A

A

Attention:

 The light sensor should be mounted 

on the opposite side of the window.

Отзывы: