![AZZA U601 Series Скачать руководство пользователя страница 13](http://html.mh-extra.com/html/azza/u601-series/u601-series_user-manual_3043869013.webp)
The
AZZA
U601 Mainboard Series
Page 12
You need to complete the following installation steps before you can use your PC.
!
Check and Set the Mainboard Settings.
!
Install the Central Processing Unit (CPU).
!
Install the Memory Modules.
!
Install the Expansion Cards.
!
Connect the Ribbon Cables, Panel Wires and the Power Supply.
!
Setup the system BIOS
Before you start installing your mainboard we strongly recommend
that you use a grounded anti-static mat. We further recommend
that you attach an anti-static wristband, which is grounded at the
same location as the mat, to your wrist.
A Diagram of the Expansion Slots, Jumpers and Connectors can be
seen on the following page
2.2. Installation Steps
Installation Checklist (Continued)
System Panel Buttons and LED Connectors
PW
SL
HL
RS
Power On/Off and Suspend Switch Connector.
Standby LED Connector
HDD LED Connector
Reset Button Connector
Speaker and Power LED Connector
PWR-LED
SPK
Power LED
Speaker Connector
Jumpers
JP1
Clear CMOS
Hardware Installation
Hardware Installation