The
AZZA
P4M Mainboard Series
Page 12
You need to complete the following installation steps before you can use your
PC.
!
Check and Set the Mainboard Settings.
!
Install the Central Processing Unit (CPU).
!
Install the Memory Modules.
!
Install the Expansion Cards.
!
Connect the Ribbon Cables, Panel Wires and the Power Supply.
!
Setup the system BIOS
Before you start installing your mainboard we strongly recommend
that you use a grounded anti-static mat. We further recommend
that you attach an anti-static wristband, which is grounded at the
same location as the mat, to your wrist.
2.2. Installation Steps
Installation Checklist (Continued)
CN5
CN6
CN7
CN18
CN19
CN35
Parallel Port
Universal Serial Port 1
Universal Serial Port 2
Game/Audio Port
VGA Port
RJ-45 (LAN) Connector
LPT
USB1
USB2
Audio/Game
VGA
LAN (only for P4M2-BL)
Speaker and Power LED Connector
PW
SL
HL
RS
Power On/Off and Suspend Switch Connector.
Standby LED Connector
HDD LED Connector
Reset Button Connector
Speaker and Power LED Connector
PWR-LED
SPK
Power LED
Speaker Connector
JP1
JP2
JP4
K/B Power
USB Power
Clear CMOS
Jumpers and Switches
Hardware Installation