Azoteq AZBAT48100B Скачать руководство пользователя страница 15

 

  

 

Copyright © Azoteq (Pty) Ltd 2021. 

AZBAT48100B Product Manual 

Page 15 of 17 

All Rights Reserved. 

 

Revision 1.00 

February 2021 

 

Azoteq

PowerSense

®

 Series

 

  Other 

1.  Do not open the battery, disassemble, or attempt to repair it as this will void the warranty. 

2.  Do not remove or tamper with the QC sticker or any other labels on the battery as this will 

void the warranty. 

3.  Take precaution to prevent the battery terminals shorting due to unforeseen events. 

4.  The batteries should not be subjected to mechanical shock or vibration. 

5.  Batteries should be recharged within 12 hours after being fully discharged. 

6.  The  supplier  does  not  take  any  responsibility  for  direct  or  indirect  damages  caused  by 

incorrect use or negligence. Please refer to the terms and conditions of sale and the warranty 
document. 

 

Emergency conditions 

Please refer the material safety datasheet (MSDS) for the batteries on the Azoteq website. 

  Leaking cells 

1.  In the event of a cell leaking liquid or gas, take caution to prevent any contact with the skin 

and eyes and inhaling the gas. 

a.  Inhalation: Evacuate the contaminated area immediately and seek medical attention. 

b.  Contact  skin:  Wash  the  affected  area  thoroughly  with  soap  and  water  and  seek 

medical attention. 

c.  Contact with eyes: Rinse your eyes properly with water and seek medical attention. 

  Fire 

2.  In the unlikely event of a fire, a dry chemical type extinguisher such as CO2 extinguisher will 

work effectively. 

Do not

 use water to extinguish the fire. 

  Other 

3.  Wet batteries 

a.  If the batteries are wet, please switch the battery OFF immediately. 

b.  Please contact the supplier for further technical support. 

4.  Damaged batteries 

a.  If the batteries seem to be physically damaged, please do not switch them ON. 

b.  Damaged batteries can be dangerous and need to be handled with care. 

c.  Please contact the supplier for further technical support. 

 

 

 

 

Содержание AZBAT48100B

Страница 1: ...g instructions in this document before operating the battery Table of Contents LITHIUM IRON PHOSPHATE BATTERY 1 AZBAT48100B 1 PRODUCT MANUAL 1 REVISION HISTORY 2 DISCLAIMER 2 OVERVIEW 2 PRODUCT INFORM...

Страница 2: ...48100B incorporates 30x 3 2V 15S2P configuration 50Ah Lithium Iron Phosphate LiFePO4 cells with a 1C charge and discharge rating The battery incorporates a battery management system BMS which provides...

Страница 3: ...teq Pty Ltd 2021 AZBAT48100B Product Manual Page 3 of 17 All Rights Reserved Revision 1 00 February 2021 Azoteq PowerSense Series Product Information Production dimensions Figure 1 AZBAT48100B physica...

Страница 4: ...arge Voltage 54 8V Float Sustain Voltage 54V Standard Charge 30A 0 3C Maximum Charge 50A 0 5C BMS protection for higher charge current Standard discharge 50A 0 5C Maximum Discharge 95A 0 95C BMS Commu...

Страница 5: ...erature recovery 15 C Environmental over temperature protection 70 C Environmental temperature recovery 60 C Environmental under temperature 20 C Environmental under temperature recovery 15 C Power ov...

Страница 6: ...ned on initially Please refer to Table 3 for the LED indicator definitions Switching ON This is done with a short press and release of the switch after which the green RUN LED will start to flicker gr...

Страница 7: ...SOC DESCRIPTION GREEN RED GREEN GREEN GREEN GREEN SHUT DOWN SLEEP OFF OFF OFF OFF OFF OFF ALL OFF STANDBY NORMAL FLASH 1 OFF OFF OFF OFF OFF STANDBY STATUS CHARGE NORMAL ON OFF BASED ON CAPACITY HIGH...

Страница 8: ...port definitions The battery has a two RJ45 MODBUS RS485 communication ports and one RJ45 CANBUS port Please refer to the tables below for the port definitions Figure 4 RJ45 network cable pin referen...

Страница 9: ...s 2 CANBUS communication cable usually supplied with the inverter 3 Parallel communication cable when using multiple batteries 4 Ground cable and screw M5 to earth the battery to the installation 5 DC...

Страница 10: ...e the polarity of the connection between the inverter and the batteries are correct 6 Connect the RS485 cables between the batteries when using multiple batteries a As depicted by the yellow connectio...

Страница 11: ...es on the inverter should match the values as in Table 5 These values should update automatically on the inverter The battery voltage charge and discharge current SOC value and battery temperature wil...

Страница 12: ...ghts Reserved Revision 1 00 February 2021 Azoteq PowerSense Series Table 5 Address DIP switch configuration OF BATTERIES ADDRESS SETTING CHARGE CURRENT DISCHARGE CURRENT 1 MASTER 45A 95A 2 MASTER 55A...

Страница 13: ...on top of each other when using multiple batteries in parallel Each battery should be installed on a mounting plate to allow air circulation Please refer to Appendix A for an expanded list of address...

Страница 14: ...e inverter is not powered from AC mains while connecting the battery 6 It is advised to use suitable protection between the battery and the inverter 7 Make sure the polarity positive and negative conn...

Страница 15: ...the material safety datasheet MSDS for the batteries on the Azoteq website Leaking cells 1 In the event of a cell leaking liquid or gas take caution to prevent any contact with the skin and eyes and i...

Страница 16: ...Copyright Azoteq Pty Ltd 2021 AZBAT48100B Product Manual Page 16 of 17 All Rights Reserved Revision 1 00 February 2021 Azoteq PowerSense Series Appendix A Expanded DIP Settings...

Страница 17: ...for any purpose Azoteq disclaims all warranties and conditions with regard to these products and information including but not limited to all implied warranties and conditions of merchantability fitne...

Отзывы: