6-2. Liquid level transmission
The operation method (start up procedure) described here assumes that the meter body has
been installed as shown in “5-9-1: Model 11/22/33/44/81/82” (6) and “5-9-2: Connection of
flange type meter body to process” of “Chapter 5 : Installation”. No operation procedure is
needed for the process connections with flanges (diaphragms). Of model 71 or 72, operation is
ready when its installation has been completed.
(1) Check that piping has been correctly done.
(2) Unless self drain or self vent piping has been provided, liquid or gas will be entrapped in
the measuring chambers and pressure connection pipes, thereby causing measurement
errors. Be sure to purge any remaining liquid or gas. For this procedure, refer to “Chapter
7 : Inspection and Maintenance”.
(3) Zero point check:
When the instrument has become ready for measuring, prepare a receiver instrument and
check and adjust the zero point.
(4) Open the stop valves and start operating the instrument. If seal liquid is used, fill the low
pressure side tapping-pipe with seal liquid.