
Azbil Corporation
Installation
Model JTD720A - Smart Multivariable Transmitter 2-7
High-pressure marking
H indicates high pressure on the center body. Check the mark to ensure correct
installation, during piping work. The low pressure side has no mark.
Figure 2-6 High pressure marking on center body
Pipe selection
Select a schedule number and nominal thickness for the connecting pipe leading from
a process, based on such conditions as process pressure.
For example, use a 1/2-inch, steel pipe with a schedule number 80.
Materials and requirement
Prepare in advance the following parts and always refer to the illustration.
•
3-way manifold valve
• Pipe
• Main valve
•
Union or flange
•
Tee
• Drain valve
• Drain plug
•
Vent plug
•
Seat pot (for steam flow rate measurement only)
Содержание JTD720A
Страница 1: ...CM2 DST720 2001 Smart Multivariable Transmitter Model JTD720A User s Manual...
Страница 34: ...Installation Azbil Corporation 2 16 Model JTD720A Smart Multivariable Transmitter...
Страница 49: ...Azbil Corporation Starting and Stopping this Device Model JTD720A Smart Multivariable Transmitter 3 15...
Страница 50: ...Starting and Stopping this Device Azbil Corporation 3 16 Model JTD720A Smart Multivariable Transmitter...
Страница 70: ...Azbil Corporation 4 20 Model JTD720A Smart Multivariable Transmitter...
Страница 71: ......
Страница 74: ......
Страница 76: ......