
10-6
Chapter 10. PLC Link Communication
To set up PLC link communication, use the SLP-C7 Smart Loader Package.
Open the Setup screen of SLP-C7 and click the
[PLC Link]
button to open the
[PLC Link]
window.
An example is presented here using the SLP-C7 screen.
z
Common settings
(4)
(1)
(6)
(5)
(2)
(3)
(1) Select the
[Common]
tab to configure the PLC connection settings common to
transfer 1 to 4.
(2) Enter the IP address of the PLC.
(3) Enter a value for each item.
(4) Click the
[Register]
button to enable the configured PLC link settings.
Note that registration only rewrites the settings in the PC memory. After
registration, the settings must be written, along with other parameters, to the
controller or be saved in a PC file.
(5) Click the
[Cancel]
button to discard the configured PLC link settings.
(6) Click the
[Check]
button to check that all the transfer setting addresses have
been defined.
10 - 2 PLC Link Setting Method