12
STEP-3 Fasten the dust collect bag on the
canister filter by bag clamp.
Please refer to the picture.
STEP-4 Final step: Combine the impller
housing, machine bracket, cyclone funnel
assembly, canister filter together.
Please refer to the picture.
4.1 Fasten the impeller housing on the main
bracket by bolt M8X20.
Содержание 107571
Страница 1: ...AW145CE Cyclone Extractor Code 107571 Original Instructions AT 09 02 2022 BOOK VERSION 01 ...
Страница 26: ...7 Diagram and part list 7 1 Diagram 23 ...
Страница 28: ...25 7 3 Wiring diagram 120V 60HZ 230V 50HZ 400V 50HZ ...
Страница 29: ......