compliance. Normally, such responsibilities with lie with the representative, unless other
arrangements (under Article 9) have been made.
Requirements for WEEE compliance may include registration of products with local
governments, reporting of recycling activities to local governments, and financing of
recycling activities.
FIRMWARE LICENSING
Instruments with firmware versions 5.00 or higher use open-source software internally.
Some of this software requires that the source code be made available to the user as a
condition of its licensing. This source code is available upon request (contact
[email protected]).
Earlier firmware versions do not contain any open source software.
10
Содержание AVR-AHF-1-B series
Страница 34: ...PCB 158R4 LOW VOLTAGE POWER SUPPLY...
Страница 35: ...PCB 197G HIGH VOLTAGE DC POWER SUPPLY DISCHARGE...
Страница 43: ...PERFORMANCE CHECK SHEET 43...