INSTALLING
THE
MOUNTING
BRACKET
WARNING
:
WHEN
CUTTING
OR
DRILLING
INTO
CEILING,
DO
NOT
DAMAGE
ELECTRICAL
WIRING
AND
OTHER
HIDDEN
UTILITIES.
WHEN
BUILDING
FRAMEWORK,
ALWAYS
FOLLOW
ALL
APPLICABLE
CONSTRUCTION
CODES
AND
STANDARDS.
To
construct
wood
wall
framing
that
is
flush
with
surface
of
ceiling
studs,
ensure
that:
a)
The
framing
is
centered
over
installation
location
and
is
sturdy
enough
to
support
the
weight
of
the
hood.
b)
The
height
of
the
framing
will
allow
the
mounting
bracket
to
be
secured
to
the
framing
within
the
dimensions
shown.
After
wall
surface
is
finished,
carefully
center
and
level
the
hood
mounting
bracket,
secure
it
to
wall
framing
with
3
No.
8
x
1½"
mounting
screws.
Tighten
the
screws
completely.
INSTALLING
THE
MOUNTING
BRACKET
(
continued
)
IMPORTANT:
Make
sure
that
holes
locations
are
leveled
and
correctly
centered
by
the
vertical
centerline
(this
installation
instruction
applies
for
concrete
wall).
WARNING:
AT
LEAST
TWO
PEOPLE
ARE
REQUIRED
TO
LIFT
AND
POSITION
THE
HOOD
ONTO
THE
MOUNTING
SCREWS.
WARNING:
BE
CAREFUL
WHEN
INSTALLING
THE
DECORATIVE
CHIMNEY
AND
HOOD,
THEY
MAY
HAVE
SHARP
EDGES.
CAUTION:
DO
NOT
REMOVE
THE
PROTECTIVE
PLASTIC
FILM
COVERING
THE
DECORATIVE
CHIMNEY
AT
THIS
STAGE.
INSTALLING
THE
UNIT
Secure
the
hood
to
the
recommended
height
of
26
"above
the
electrical
cooking
surface
and
30"
above
the
gas
cooking
surface.
Refer
to
the
tools
list
to
proceed
with
installation
23
Adjust
the
brackets
to
the
desired
height
Install
the
duct
on
the
air
outlet