Step1. ACCOUNT FOR ALL PARTS.
Remove all the parts from the carton(s) and place them on the ground in the location where they are to be assembled
Check each part according to “PART REFERENCE” .Make sure all the pieces to be assembled are accounted for.
IMPORTANT:
Do not start assembly if any pieces are missing. For replacement pieces call the Consumer Service
telephone number in your area.
The number of persons required for installation: 2 adult at least.
Total installation time except the time for site preparation and water filling :
10 minutes for size Ф8’x25”/Ф10’x30”/Ф12’x30”/Ф12’x33”/Ф12’x36”
30 minutes for size Ф14’ x 33”
Step2. INSTALL DRAIN VALVES COVER AND STOPPER
Make sure that outer drain plug is inserted into the outer drain cap and drain valve cover is screwed on tightly.Plug the con-
nection holes with the stoppers. (The out drain plug changes according to different size of pool.)
STOPPER
Out Drain Plug A
Out Drain Plug B
Drain Vavle Cover
Step3.
INFLATE THE TOP RING
Keeping the top ring in the middle of the pool (the top ring must be kept inside the circumference of
the pool bottom.)
VERY IMPORTANT
: The top ring should be filled to approx. 85% capacity only. DO NOT attempt
to inflate the ring past this point.Excessive inflation of the top ring can cause the ring to burst or
cause damage to the ring’s seams.
80
%
WARNING:
Do not leave pool unattended while filling with water.
WARNING:
If more than 1~2 inches of water collects on any one side before you
start filling in the center.The pool is not level enough, and must be corrected! You
shall pull out the drain plug, release the water completely, disassemble the pool
completely,locate the pool on a plane surface, repeat set up instruction.
WARNING:
DO NOT OVERFILL as this could cause the pool to collapse.In times of
heavy rainfall you may need to empty some of the water to ensure the level is correct.
PART5-FILL THE POOL WITH WATER