Caution:
In operating environments where the ambient temperature is above 40C, the metal surfaces
on the AL7018005–E6 FI cables can become hot. Use caution when removing or handling
hot equipment.
Base unit
The base unit switch is located on the front panel of the switch. Use the base unit switch to
designate a unit in the Stack as the Base unit. Slide the base unit switch to the down position
to designate a unit as the Base unit. You must designate only one switch in a Stack as the
Base unit. The base unit switch of all the other non-base units (NBU) in the Stack must be in
the up position. You can verify the Base unit from the base unit switch position and Base LED
display on the front status panel.
Base unit
VSP 7000 installation
July 2013 45
Содержание VSP 7000 Series
Страница 4: ...4 VSP 7000 installation July 2013 Comments infodev avaya com ...
Страница 6: ...Installing an MDA 66 Appendix A Hardware reliability 67 6 VSP 7000 installation July 2013 ...
Страница 19: ...Figure 1 Fan trays Figure 2 AC power supply Cooling fans and power supplies VSP 7000 installation July 2013 19 ...
Страница 28: ...Installation preparation 28 VSP 7000 installation July 2013 Comments infodev avaya com ...
Страница 56: ...Fabric Interconnect connectivity 56 VSP 7000 installation July 2013 Comments infodev avaya com ...
Страница 68: ...Hardware reliability 68 VSP 7000 installation July 2013 Comments infodev avaya com ...