Issue 1 May 2002
5-1
555-233-143
Additional Maintenance Procedures
This chapter describes updates, tests and preventive measures not covered
elsewhere in this book. It includes the following topics:
■
‘‘DS1 CPE Loopback Jack (T1 Only)’’ on page 5-2
■
‘‘Facility Test Calls’’ on page 5-15
■
‘‘Preventive Maintenance’’ on page 5-24
■
‘‘Analog Tie Trunk Back-to-Back Testing’’ on page 5-26
■
‘‘Terminating Trunk Transmission Testing’’ on page 5-31
■
‘‘Removing and Restoring Power’’ on page 5-32
■
Содержание S8700 Series
Страница 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Страница 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Страница 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Страница 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Страница 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Страница 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...
Страница 1121: ...CARR POW Carrier Power Supply Issue 1 May 2002 8 399 555 233 143 Figure 8 19 Power Distribution Unit J58890CH 1 ...
Страница 1447: ...E DIG RES TN800 reserve slot Issue 1 May 2002 8 725 555 233 143 E DIG RES TN800 reserve slot See ASAI RES ...
Страница 1735: ...LGATE AJ Issue 1 May 2002 8 1013 555 233 143 LGATE AJ See BRI SET LGATE BD See BRI BD LGATE PT See BRI PT ...
Страница 1846: ...Maintenance Object Repair Procedures 555 233 143 8 1124 Issue 1 May 2002 Figure 8 62 TN787 MMI MULTIMEDIA INTERFACE CIRCUIT PACK ...