Maintenance-Object Repair Procedures
555-233-143
8-676
Issue 1 May 2002
System Technician-Demanded Tests:
Descriptions And Error Codes
Always investigate tests in the order presented in the table below. By clearing
error codes associated with the Failure Audit for example, you may also clear
errors generated from other tests in the testing sequence. The Failure Audit test
is executed via the test board command.
Far-End Internal Loop-Back Test (#797)
This test is destructive.
This test starts at the DS1 CONV circuit pack whose equipment location was
entered and traverses over the specified facility and loops at the internal facility
interface on the other DS1 CONV circuit pack in the DS1 CONV complex. See
diagram below.
Every part of this test is executed under firmware control and the result is sent
back to the maintenance software. The test is executed by sending digital data
through every DS1 channel on this facility. For TN574 DS1 Converter facilities,
test patterns are sent through every DS1 channel. For TN1654 DS1 Converter
facilities, test patterns are sent through one DS1 channel.
If there is only one DS1 facility available, the system will not allow that last facility
to be busied out. In that case, the DS1 CONV circuit pack must be busied out
before executing this test.
For a standard-, duplex-, or high-reliability system (no PNC duplication), if there is
only one DS1 facility available, then this test can only be executed at the endpoint
that is closer to the media server relative to the neighbor DS1 CONV circuit pack
because of its impacts on the system control links. For TN574 DS1 CONV
boards, the completion of the test will be delayed in this configuration to wait for
the recovery of the system control links. For a critical-reliability system (PNC
duplication) or for a system with multiple DS1 facilities, the test can be executed at
any DS1 CONV circuit pack.
Order of Investigation
Short Test
Sequence
Long Test
Sequence
External
Loopback
Reset
Sequence
D/ND
1
1.
D = Destructive; ND = Nondestructive
Failure Audit (#949)
ND
DS1 Interface Options Audit (#798)
X
X
ND
Far-End Internal Loopback test
(#797)
X
D
Near-End External Loopback test
(#799)
X
D
Содержание S8700 Series
Страница 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Страница 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Страница 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Страница 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Страница 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Страница 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...
Страница 1121: ...CARR POW Carrier Power Supply Issue 1 May 2002 8 399 555 233 143 Figure 8 19 Power Distribution Unit J58890CH 1 ...
Страница 1447: ...E DIG RES TN800 reserve slot Issue 1 May 2002 8 725 555 233 143 E DIG RES TN800 reserve slot See ASAI RES ...
Страница 1735: ...LGATE AJ Issue 1 May 2002 8 1013 555 233 143 LGATE AJ See BRI SET LGATE BD See BRI BD LGATE PT See BRI PT ...
Страница 1846: ...Maintenance Object Repair Procedures 555 233 143 8 1124 Issue 1 May 2002 Figure 8 62 TN787 MMI MULTIMEDIA INTERFACE CIRCUIT PACK ...