Avaya Communication Manager controlled maintenance
CO-TRK (Analog CO Trunk)
Maintenance of the Avaya G350 Media Gateway
101
June 2004
CO Demand Diagnostic Test (#3)
For ground start trunks, port Media Module relays are operated and checks are made to see if the port can
detect and apply ground on the Tip lead. This test also verifies that there is no external ground on the
Ring lead. In the absence of other failures, the Media Module should be replaced only if this test fails
with the CO line disconnected.
1009
PASS
Detected tone was not pure dial tone. No action required.
PASS
Trunk was seized, and dial tone was detected. User-reported
troubles on this port should be investigated by using other port tests
and by examining trunk or external wiring.
0
NO
BOARD
The test could not relate the internal ID to the port.
1
Check to ensure that the board translations are correct.
Translate the board, if necessary.
2
Use the busyout board command.
3
Use the reset board command.
4
Use the release busy board command.
5
Use the test board command. This should re-establish the
linkage between the internal ID and the port.
Table 49: Test #0 Dial Tone Test 3 of 3
Error
Code
Test
Result
Description/ Recommendation
3 of 3
Содержание Media Gateway G350
Страница 1: ...Maintenance of the Avaya G350 Media Gateway 555 245 105 Issue 3 June 2004 ...
Страница 16: ...About this book Sending us comments 16 Maintenance of the Avaya G350 Media Gateway June 2004 ...
Страница 48: ...G350 component maintenance IP telephones 48 Maintenance of the Avaya G350 Media Gateway June 2004 ...
Страница 284: ...Monitoring Extended keepalive 284 Maintenance of the Avaya G350 Media Gateway June 2004 ...
Страница 306: ...G350 traps G350 traps and resolutions 306 Maintenance of the Avaya G350 Media Gateway June 2004 ...
Страница 326: ...Media Server alarms S8300 alarms UPS 326 Maintenance of the Avaya G350 Media Gateway June 2004 ...