
Page 16 - Installation
Installing DECT Base Stations (DBS)
Mounting the Base Station
Each Base Station is supplied with 1.5mtrs of cable for connection to the slave jack
socket (see page 3).
To mount a Base Station, perform the following:
1. Check the proposed position of the Base Station and ensure that there is a
minimum of 200mm's clearance on all sides of the Base Station
2. Use the Base Station Wall Mounting Bracket (see figure below) as a template to
mark the required holes.
Ensure that the Base Station is level. Drill and insert
the wall fixings for the No. 6 round-head screws.
3. Run the Base Station line cord through the access hole before fixing the bracket
to the wall with the two No. 6 round head screws
4. Push the Base Station line cord into it's socket on the Base Station
5. Slide the Base Station onto the mounting bracket (a firm push is required to slide
the Base Station lugs over the pins on the wall mounting bracket)
Wall mounting
securing screw slots
Base Station line
cord entry point
Top – viewed from front
6. Connect the base station line cord from the base station to the slave jack socket
provided for the base station
Note:
For country variants, use the following table:
Socket Type
Pins
LJU 2/3A
RJ45
RJ11
3 & 4
4 & 5
3 & 4
7. Connect, using twisted pair cable, the slave jack socket to the MDF (see page
Configuring the Base Stations
For the system to function correctly, it must measure the cable delay on signals to
and from each Base Station. Note that whilst this process is being performed the
system cannot handle calls. See
"Base Station Cable Measurement" on page 17
Page 16
Installation Manual
38DHB0002UKCA – Issue 8 (26/03/2002)
INDeX CSLC