Installing Avaya Ethernet Routing Switch4900 Series
Release 7.1
NN47212-301
Issue 01.02
February 2016
Страница 1: ...Installing Avaya Ethernet Routing Switch 4900 Series Release 7 1 NN47212 301 Issue 01 02 February 2016...
Страница 2: ...r pin assignments for PoE switches 21 Console port pin assignments 22 Equipment requirement 22 Verifying the package contents 22 Cable requirements 25 Switch installation 26 Installing the switch in a...
Страница 3: ...tors 50 Port LED state indicators 51 Appendix A Translations of safety messages 53 Safety messages 53 Contents February 2016 Installing Avaya Ethernet Routing Switch 4900 Series 3 Comments on this doc...
Страница 4: ...a Ethernet Routing Switch 4900 and 5900 Series NN47211 103 For more information on new features of the switch and important information about the latest release see Release Notes for Avaya Ethernet Ro...
Страница 5: ...AvayaMentor and perform one of the following actions Enter a key word or key words in the Search Channel to search for a specific product or topic Scroll down Playlists and click the name of a topic...
Страница 6: ...o e notifications to receive an email notification when documents are added to or changed on the Avaya Support website About this task You can subscribe to different types of general notifications for...
Страница 7: ...oll through the list and then select the product name 9 Select a release version 10 Select the check box next to the required documentation types Related resources February 2016 Installing Avaya Ether...
Страница 8: ...lease notes downloads and resolutions to issues Use the online service request system to create a service request Chat with live agents to get answers to questions or request an agent to connect you t...
Страница 9: ...2 301 is a new document for 7 1 so all the features are new in this release See Release Notes for Avaya Ethernet Routing Switch 4900 and 5900 Series for a full list of features February 2016 Installin...
Страница 10: ...cable ESD cable See Cable requirements on page 25 4 Unpack the equipment Observe ESD precautions when you unpack the equipment See Electrostatic discharge prevention on page 15 5 Verify the contents...
Страница 11: ...be permanent and must not exceed 1 Ohm of resistance from the rack to the grounding electrode See Installing the switch in an equipment rack on page 26 February 2016 Installing Avaya Ethernet Routing...
Страница 12: ...ost rack mount brackets on page 30 3 Check the LEDs to verify the installation See Switch LED state indicators on page 50 2 Optional Install the secondary power supply See Installing the secondary pow...
Страница 13: ...ular power supply units and has two field serviceable power supply receptacles which support 1025 W AC power supply modules AL4900x03 E61 Note Replace the x with a country specific power cord code See...
Страница 14: ...d ERS 19 inch rack mount hole pattern allowing horizontal or vertical flush or offset front or rear mount options Front panel one serial console connection one USB 2 1 Type A port status LED display p...
Страница 15: ...ailures While networking equipment is commonly designed and tested to withstand common mode ESD events voltage sometimes can be discharged to some connector pins but not others or to some pins before...
Страница 16: ...ll the switch and where it operates meets these requirements Warning To avoid bodily injury from hazardous electrical shock and current never remove the top of the device No user serviceable component...
Страница 17: ...in six feet one circuit required for each power supply see table AC power specifications At least 2 inches 5 08 cm on each side of the switch unit for ventilation Cables should be dressed to prevent b...
Страница 18: ...3 57 308 88 2 1025 W 200 240 VAC 816 03 3 78 342 32 1 1025 W 100 110 VAC 825 11 7 55 413 56 2 1025 W 100 110 VAC 839 64 7 73 424 24 The following table provides typical power consumption Table 4 Typic...
Страница 19: ...20 W 24 ports at 30 W 2 1025 W 200 240 VAC 30 W 720 W 24 ports at 30 W 1 1025 W 100 110 VAC 30 W 720 W 24 ports at 30 W 2 1025 W 100 110 VAC 30 W 720 W 24 ports at 30 W MTBF values The following table...
Страница 20: ...acket to comply with the CENELEC Harmonized Document HD 21 220 or 230 VAC 50 Hz Single Phase United States of America Canada Japan NEMA5 15P male plug UL recognized UL stamped on cord jacket CSA certi...
Страница 21: ...e with the switch Only FAT or FAT32 file systems are currently supported USB drives with NTFS file systems are not supported Consult the documentation provided with the USB drive to ensure compliance...
Страница 22: ...Equipment requirement After unpacking this switch check the contents to be that sure you have received all the components Then before beginning the installation be sure that you have all other necess...
Страница 23: ...ead screws Quantity 8 Country specific AC power cord Note A power cord is not included for the A variant of the switch For information see AC power cord specifications on page 20 Stacking cable 0 5 m...
Страница 24: ...t Order code Equipment Spare Rack Mount Kit used as a replacement rack mount kit 19 inch Rack Mount kit 700512595 Power Supply Unit specifications The following table lists the order codes for optiona...
Страница 25: ...rk Table 13 Console port adaptors Name Short Description Material code Avaya RJ 45 DB 9 Console Cable 1 5m cable with DB 9 Female for terminal PC on one end and RJ 45 for device console port connectiv...
Страница 26: ...r each switch in an EIA or IEC standard 19 inch 48 2 centimeter equipment rack The rack is bolted to the floor and braced if necessary The rack is grounded to the same grounding electrode used by the...
Страница 27: ...Figure 4 Front mounted rack bracket installation Switch installation February 2016 Installing Avaya Ethernet Routing Switch 4900 Series 27 Comments on this document infodev avaya com...
Страница 28: ...ation 3 Slide the switch into the rack 4 Insert and tighten the rack mount screws Installing Ethernet Routing Switch 4900 Series February 2016 Installing Avaya Ethernet Routing Switch 4900 Series 28 C...
Страница 29: ...Figure 6 Front mounted rack installation Switch installation February 2016 Installing Avaya Ethernet Routing Switch 4900 Series 29 Comments on this document infodev avaya com...
Страница 30: ...the four post rack mount kit Tools Phillips screwdriver to attach brackets to the switch and the switch to the rack Hex wrench to assemble and attach the optional four post rack mount brackets Rack r...
Страница 31: ...ground path must be permanent and must not exceed 1 ohm of resistance from the rack to the grounding electrode Figure 8 Four post rack mount kit assembly Procedure 1 Attach a front bracket to each gu...
Страница 32: ...e rear of each guide bracket to the switch chassis b Verify that the rear screws sit flush in the guide brackets Installing Ethernet Routing Switch 4900 Series February 2016 Installing Avaya Ethernet...
Страница 33: ...re 9 Install switch in rack using front rack mounts 4 Attach the rear mounting brackets and secure the switch to the rear rack posts a Slide a rear mounting bracket into each guide bracket channel unt...
Страница 34: ...ad sharing Before you begin Verify switch compatibility with the power supply For more information see Power Supply Unit specifications on page 22 Electrostatic alert To prevent damage from electrosta...
Страница 35: ...ternational use You must use a power cord that is approved for the receptacle type in your country For more information see AC power cord specifications on page 20 Procedure Connect the AC power cord...
Страница 36: ...eiver between the thumb and forefinger 4 Insert the transceiver into the proper module on the switch Apply a light pressure to the transceiver until it clicks and locks into position in the module 5 R...
Страница 37: ...rom the transceiver 2 Use the locking mechanism on the transceiver to release it The locking mechanism varies from model to model as illustrated below Connecting a transceiver to the switch or switch...
Страница 38: ...nsceivers Small form factor pluggable SFP transceivers SFPs are hot swappable input and output enhancement components designed to allow gigabit Ethernet ports to link with other gigabit Ethernet ports...
Страница 39: ...otices on page 42 1000BASE LX SFP 1310 nm LC connector AA1419015 E5 This transceiver has reached end of sale EOS For more information about EOS transceivers and recommended replacements for your produ...
Страница 40: ...net duplex LC connector AA1419052 E6 This transceiver has reached end of sale EOS For more information about EOS transceivers and recommended replacements for your product see Locating end of sale not...
Страница 41: ...10 gigabit connections All Avaya SFP transceivers use Lucent connectors LC to provide precision keying and low interface losses The following table lists and describes the Avaya SFP models Table 15 Su...
Страница 42: ...information on end of sale notices and replacement recommendations for transceivers and optical components Procedure 1 Go to the Avaya Support website at http support avaya com 2 Select Support by Pro...
Страница 43: ...ctor of another unit to the Cascade Up connector of the first unit completes the stack connection Important To create a stack connection order the appropriate switch cascade cables to ensure fail safe...
Страница 44: ...unit MAC address plus 1 If another unit in the stack is assigned as the base unit the new stack MAC address is the MAC address of the new base unit plus 1 The original stack IP address still applies t...
Страница 45: ...a failed connection in the stack configuration 1 Base Unit 2 Last Unit 3 Unit selector switch 4 Cascade Cable In the example the following occur Unit 3 becomes nonoperational due to a unit failure ca...
Страница 46: ...e position Only one switch in the stack must have the Base Unit Select switch set to the Base position 3 Connect stacking cables as required for a Cascade Up stack up or Cascade Down stack down config...
Страница 47: ...silient Use longer Stack Cable if required Figure 12 Cascade Down Stack Down configuration Cascade up In a cascade up stack up configuration the base unit is physically the bottom unit in the stack Th...
Страница 48: ...unit discovers the stack in a cascade up stack up direction 1 Base Unit 2 Last Unit 3 Cascade or Stack Cable 4 Cascade Stack Cable Return cable to make stack resilient Use longer Stack Cable if requir...
Страница 49: ...l member 5 Check the log file on the stack to ensure that the replacement unit correctly joined the stack The log file displays AUR information messages If you replace the base unit remember that the...
Страница 50: ...up down cables Green blinking The switch formed a partial neighbor with the adjacent switch over Stack up down cables Check the switch logs Amber solid The switch detects Stack up down cables are pres...
Страница 51: ...at 1000 Mb s and no PoE power is delivered on non PoE switch ports or PoE switches without a PoE consumer attached to the port Amber Green Pulse The port is experiencing a PoE error Off When the Link...
Страница 52: ...d and link established Amber Flashing SFP established and transmit receive activity detected Amber Blinking TX and RX blink together slowly to indicate a disabled port Off No SFP or SFP connection det...
Страница 53: ...eiten geeignet Important Si vous installez le module dans une baie ne l empilez pas directement sur un autre Chaque module doit tre fix sa propre baie l aide des supports de montage appropri s Ces sup...
Страница 54: ...isser la plaque m tallique sur la baie Si vous la retirez l a ration du module ne peut pas s effectuer correctement Important Precaution Si no instala ning n m dulo en la ranura aseg rese de mantener...
Страница 55: ...en cas d urgence Important Advertencia Para apagar el dispositivo debe desenchufar el cable Conecte siempre el cable de alimentaci n a una toma segura y de f cil acceso por si se produjera alguna situ...
Страница 56: ...essives Important Peligro Utilice nicamente cables de alimentaci n con toma de tierra De lo contrario al tocar el interruptor puede recibir una descarga el ctrica Si no hay un circuito de toma de tier...
Страница 57: ...gnments 22 R RJ 45 pin assignments 21 S support 8 U Universal Serial Bus USB ports 21 USB ports 21 V videos 5 February 2016 Installing Avaya Ethernet Routing Switch 4900 Series 57 Comments on this doc...