Blocking Standby SPE Maintenance Activities for
System Testing
Issue 4 May 2002
6-35
555-233-123
Blocking Standby SPE Maintenance
Activities for System Testing
Sometimes it is necessary to block Standby SPE maintenance activities so that
system technician commands that test Standby SPE components can be
conducted without being blocked with the G3MT terminal message line “Standby
SPE busy with another task; for information use ‘status system’.” To block
Standby SPE maintenance activities, perform the steps listed below.
!
WARNING:
The following procedure involves throwing the SPE Select Switches to
hard-select the current Active SPE. After completing the circuit pack
replacement procedure, verify that the SPE Select Switches have been
returned to the AUTO position both by noting their position and by noting
that the SPE Select Switch LEDs on the TN772 Duplication Interface circuit
packs are not on.
1. Throw the SPE Select Switches (on the TN772 Duplication Interface circuit
packs) to force selection of the current Active SPE. If SPE-B is currently
the Active SPE, throw both SPE Select Switches to the right. If SPE-A is
currently the Active SPE, throw both SPE Select Switches to the left.
2. Issue status system 1st-cabinet from the G3MT terminal. The status
system form indicates the presence of MAJOR and MINOR alarms on both
SPEs. If SPE alarm counts are displayed, run component tests to resolve
these alarms. Allowed tests include test spe-standby, test
duplication-interface, and test shadow-link. Use the next step if the allowed
test commands are not accepted, otherwise skip the next step.
!
CAUTION:
If the Duplication Interface circuit pack is being tested, Test #278 fails
because the SPE Select Switches are thrown.
3. Issue busyout spe-standby followed by release spe-standby to force the
Standby SPE into a mode to accept the test commands attempted in the
previous step. Wait 5 minutes for the Standby SPE to initialize and issue
the status system 1st-cabinet command. If the Standby SPE failed to
initialize if the Standby SPE Mode is down. If the Standby SPE Mode is
maint/init or maint/entering, execute the busyout spe-standby and release
spe-standby command up to 2 more times. If this step does not succeed,
try this procedure again.
4. Move each SPE Select Switch back to the AUTO position.
!
WARNING:
Move only one SPE Select Switch at a time. DO NOT move both
switches at the same time.
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...