
BRI-SET, ASAI-ADJ, BRI-DAT
Issue 4 May 2002
10-313
555-233-123
BRI XID Test (#628)
This test checks the D-channel connection between the SPE and the endpoint or
adjunct.
In this test, a D-channel XID frame is sent to the endpoint or adjunct over the
point-to-point signaling link. The test passes if the endpoint or adjunct responds
with a Layer 2 XID-RESPONSE frame.
This test must be administered to not run in the station administration form for
ports on a TN2208.
Table 10-124.
TEST #628 BRI XID
Error
Code
Test
Result
Description/Recommendation
1000
ABORT
The BRI-SET, ASAI-ADJ, ATT-ADJ, LGATE-AJ, ATTE-AJ is
busy. The test cannot be executed at this time:
1. Pause momentarily (30 seconds) and re-execute at this
time.
2. If this problem persists, escalate this problem.
NOTE:
A BRI-PORT can also be busy. When using this for
BRI-PORT/ABRI-PORT tests, the words “BRI-SET,
ASAI-ADJ, ATT-ADJ,“ can be changed to “BRI-PORT,
ABRI-PORT, ATT-ADJ.“
1005
ABORT
The endpoint is not administered to support XID Testing.
1. If the endpoint documentation reflects support XID testing,
use the change station extension command to change
the XID Testing? field on the form to y.
1113
ABORT
The signaling link between the switch and the endpoint is
down.
1. Use the test port PCSSpp long command to clear any
errors which prevent establishment of the signaling link.
2. Examine the results of the Signaling Link Status Test
(#626) which is run as part of this command. If this test
aborts or fails, follow the repair procedure for Test #626.
3. If the XID test continues to abort, escalate the problem.
1139
ABORT
The Packet Bus in the port network is out-of-service.
1. Follow the repair procedures for the Packet Bus.
2. After completing Step 1, execute the test port long
PCSSpp command, and review the results of the BRI Port
Local LAN Loop Around Test to verify the repair.
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...