
Maintenance Object Repair Procedures
555-233-123
10-310
Issue 4 May 2002
This test is not executed for ASAI adjuncts because adjuncts do not support MIMs
upon which this test is based.
Table 10-123.
TEST #627 BRI Remote Loop Back
Error
Code
Test
Result
Description/Recommendation
1000
ABORT
Could not seize the endpoint or B-channels for test.
1. Retry the command at 1-minute intervals a maximum of 5
times.
1005
ABORT
The endpoint’s MIMs Supported field is administered to “no.”
1. Use the change station extension command to change
parameter only if the endpoint documentation reflects
support for ISDN-BRI Management and Maintenance
Procedures.
1113
ABORT
The signaling link between the switch and the endpoint is
down.
1. Use the test port PCSSpp long command to clear any
errors which prevent establishment of the signaling link.
2. Examine the results of the Signaling Link Status Test
(#626) which is run as part of this command. If this test
aborts or fails, follow the repair procedure for Test #626.
3. If the XID Test #628 continues to abort, escalate the
problem.
1139
ABORT
The Packet Bus in the port network is out-of-service.
1. Follow the repair procedures for the Packet Bus.
2. After completing Step 1, execute the test port long
PCSSpp command, and review the results of the BRI Port
Local LAN Loop Around Test to verify the repair.
1141
ABORT
The PKT-CTRL is out-of-service.
1. Refer to PKT-CTRL (Packet Control Circuit Pack)
Maintenance documentation.
2. If Step 1 does not resolve the problem, escalate to the
next tier.
1144
ABORT
The PPN Packet Bus is out-of-service.
1. Follow the repair procedures for the Packet Bus in the
PPN.
2. After completing Step 1, execute the test port long
PCSSpp command, and review the results of the BRI Port
Local LAN Loop Around Test to verify the repair.
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...