
Maintenance Object Repair Procedures
555-233-123
10-224
Issue 4 May 2002
Remote Layer 3 Query (#1291)
This test queries the far-end switch or terminal adapter to determine if the
signaling connection is functioning properly at Layer 3. It selects a B-channel in
the in-service or maintenance service state and sends an ISDN Layer 3 SERVice
message, which requires a response from the far end (similar to performing Test
#256 on an ISDN trunk). The test is not performed if there are no B-channels in an
appropriate ISDN service state (for example, when none are administered or they
are all out of service).
NOTE:
The service state can be displayed by using the status trunk <trunk
group/trunk member> or status pri-endpoint command.
1
FAIL
Layer 2 of the signaling channel is down
1. Examine the results of the Signaling Test (#636) and follow
recommendations provided there.
2. If Test #636 (Primary Signaling Link Hardware Check)
passes, the Layer 2 Query test may still fail if the Signaling
Channel at the far end has not been administered correctly
or if the Signaling Channel has been busied out.
3. Verify that the Signaling Channel (D-channel) at the far end
has been administered correctly.
4. Verify that the ATM-DCH port used for the D-channel has not
been busied out at the far end.
3
FAIL
The D-Channel is down.
1. Examine the results of the Primary Signaling Link Hardware
Check (#636) and follow recommendations provided there.
2. If Test #636 (Primary Signaling Link Hardware Check)
passes, the Layer 2 Query test may still fail if the Signaling
Channel at the far end has not been administered correctly
or if the Signaling Channel has been busied out.
3. Verify that the Signaling Channel (D-channel) at the far end
has been administered correctly.
4. Verify that the ATM-DCH port used for the Primary and
Secondary D-channels has not been busied out at the far
end.
PASS
The Primary Signaling Channel is up.
Table 10-84.
TEST #647 Layer 2 Status Query Test — Continued
Error
Code
Test
Result
Description/Recommendation
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...