Adding New Carriers and EPN Cabinets
555-233-115
6-62
Issue 7 November 2003
Figure 6-33.
Locations of Top and Bottom Ground Straps on Standard and
Enhanced Carriers
8. If a switch node carrier is being installed in the D position of the PPN, install
the TDM/LAN cable (between the E and D carriers) to the pin-field block
marked TDM/LAN on the right side of both carriers. See
(for
critical reliability) and
Figure Notes
1. Standard AC-powered Carrier
2. Enhanced Carrier (in PPNs using
either AC power [U.S.] or Global
power)
3. Top Ground Straps
4. Bottom Ground Straps
P1
P1
1
2
lcdfgrn2 KLC 022100
G9
G9
G1
0
00
01
TD
M
/
LA
N
ICCA
ICCB
02
03
04
G1
G2
7
8
10
11
1
3
2
4
5
6
3
4
3
4