
Unpacking the 703t server
Introduction
Follow this procedure to unpack the server and peripherals.
Warning:
Risk of personal injury
The 703t Avaya CallPilot
®
server weighs approximately 22 kg (46 lb) as shipped from
manufacturing. If necessary, and to prevent personal injury, ask someone to help you unpack
and position the server.
To unpack the equipment
Important:
As you unpack each item, check it off against the packing list, as well as against the following
checklists provided in the Installation and Configuration Task List (NN44200-306):
• "CallPilot software media and documentation checklist"
• "CallPilot server hardware checklist"
1. Carefully open the cardboard carton containing the server.
2. Remove the server from the carton and set it on the floor.
3. Carefully open the cartons containing the monitor, keyboard, mouse, modem, and
ELAN hub (if supplied), and set the peripherals aside.
4. Put all manuals, CD-ROMs, operating system disks, and any disks for peripherals
in a safe place.
5. Save all packing materials and cartons in case you must return any equipment to
the carrier.
Preinstallation requirements
26 Avaya CallPilot® 703t Server Hardware Installation
December 2010
Содержание CallPilot 703t
Страница 1: ...Avaya CallPilot 703t Server Hardware Installation 5 0 NN44200 304 01 03 December 2010...
Страница 4: ...4 Avaya CallPilot 703t Server Hardware Installation December 2010...
Страница 22: ...703t server description 22 Avaya CallPilot 703t Server Hardware Installation December 2010...
Страница 34: ...Preinstallation requirements 34 Avaya CallPilot 703t Server Hardware Installation December 2010...
Страница 52: ...52 Avaya CallPilot 703t Server Hardware Installation December 2010...