
3. Open the cartons containing the monitor, keyboard, mouse, modem, and ELAN
Ethernet switch or hub (if supplied), and set the peripherals aside.
4. Remove the dongle from the box and set it aside
5. Put all manuals, DVDs or CDs, operating system disks, and any disks for peripherals
in a safe place.
6. Save all packing materials and cartons in case you must return any equipment to
the carrier.
What is next?
Continue with
Installing the server and peripheral devices
on page 29.
Preparing for installation
28 Avaya CallPilot® 1006r Server Hardware Installation
December 2010
Содержание CallPilot 1006r
Страница 1: ...Avaya CallPilot 1006r Server Hardware Installation 5 0 NN44200 320 01 03 December 2010...
Страница 4: ...4 Avaya CallPilot 1006r Server Hardware Installation December 2010...
Страница 44: ...Connecting the server to power 44 Avaya CallPilot 1006r Server Hardware Installation December 2010...