
Chapter 1
Installing the Application Gateway
Rack Mounting the Application Gateway
10
Application Gateway Hardware Installation Guide
Installing the Server into a Two-Post Rack
If you are installing the server into a two-post (Telco) rack, follow the
directions given on the previous pages for rack installation. The only
difference in the installation procedure will be the positioning of the rack
brackets to the rack. They should be spaced apart just enough to
accommodate the width of the telco rack, as illustrated below.
Содержание AG250
Страница 4: ...Contents Application Gateway Hardware Installation Guide iv...
Страница 26: ...Part Number 300 60 00...