Chapter 2 Installation
2.1 Unpacking Inspection
1. Open the packing box and take out the UPS, be careful not to
drop it as it is heavy.
2. Check whether the UPS has been damaged in transport. In the
event of any damage to the UPS, please notify the distributor for a
check and don’t turn it on.
3. Check the accessories against the delivery accessory list, please
contact the distributor if any accessory is missing.
2.2 Installation
2.2.1 Matters Needing Attention
1. 1kVA UPS
(including long backup time UPS
) is recommended to be
placed on the desk or ground near the load, and 2kVA/3kVA UPS
(including long backup time UPS)
is recommended to be placed on
even ground.
2. The distance from the rear and side panels of the UPS to the wall
or other equipment should be greater than 10cm, and the air inlets
on the front panel should be kept unblocked, so as to facilitate
ventilation and heat dissipation. Otherwise, the UPS internal
temperature will rise, which will shorten UPS lifetime.
3. Install the UPS in environment with good ventilation, avoid
installing it in environment with excessive temperature or humidity,
keep the UPS away from water, flammable gas, corrosive materials,
12 Chapter 2 Installation
E1-20010915-C-1.0