5 Intelligent Boiler Sequencing
Page | 82
MM Application Possibilities
As well the options/parameters given in section 5.3.1, the following also need to be set for steam
sequencing:
•
Option 41 – Sets whether all the lag boiler states, either the first lag is kept in standby state
with the second lag in warming and the remaining lag MMs off, or all the lag boilers after the
first lag boiler are kept in warming state and there are no boilers offline.
•
Option 42 – Sets the standby setpoint for sequencing where non-return valves are installed;
the first lag boiler will aim to maintain this standby setpoint when in the warming/standby
phase. This is set as absolute value.
•
Options 53 – Sets the steam sequencing burner off time. This is the time in minutes for how
long the boiler will be off for during Warming mode.
•
Option 54 – Sets the steam sequencing burner on time. This is the time in minutes for how
long the boiler will be in low flame hold for the boiler to heat up to its standby setpoint, when
in Warming mode. Options 42, sets the standby setpoint.
5.4.3 Low Pressure Steam Sequencing
For steam boiler plants where check (non-return) valves are not installed, or the required setpoint is
less than 2 Bar (20 PSI), it is not possible to use a standby setpoint. Each pressure sensor would
read the same pressure value, regardless of individual boiler temperature/ pressure. A thermostat
(Aquastat) can be installed into the boiler shell, and option 40 must be set to low pressure steam
sequencing.
For the Mk8 MM, a 230V/ 120V input on terminal 93 (see option 79) will initiate the warming for that
lag boiler, and this will fire according to the warming interval timings in options 53 and 54.
For the Mini Mk8 MM, a 230V/ 120V input on terminal 82 (see option/ parameter 156) will initiate
warming for that lag boiler, and this will fire according to the interval timings in options 53 and 54.
Содержание Mk8 MM
Страница 1: ...Combustion Management Systems MM APPLICATION POSSIBILITIES Technical Manual 18 12 2019...
Страница 8: ...1 Sensors Page 2 MM Application Possibilities Gas Pressure Sensor...
Страница 27: ...1 Sensors Page 21 MM Application Possibilities Air Pressure Sensor...
Страница 32: ...1 Sensors Page 26 MM Application Possibilities Steam Pressure Sensor...
Страница 36: ...1 Sensors Page 30 MM Application Possibilities Outside Temperature Sensor...
Страница 37: ...1 Sensors Page 31 MM Application Possibilities Outside Temperature Module...
Страница 38: ...1 Sensors Page 32 MM Application Possibilities Outside Temperature Module Wiring...
Страница 42: ...2 Flame Safeguard Page 36 MM Application Possibilities 2 1 1 Interrupted Pilot Gas...
Страница 43: ...2 Flame Safeguard Page 37 MM Application Possibilities 2 1 2 Interrupted Pilot Oil...
Страница 44: ...2 Flame Safeguard Page 38 MM Application Possibilities 2 1 3 Intermittent Pilot Gas with Post VPS...
Страница 46: ...2 Flame Safeguard Page 40 MM Application Possibilities IR End View Scanner...
Страница 48: ...2 Flame Safeguard Page 42 MM Application Possibilities Self Check End View UV Scanner High Sensitivity...
Страница 50: ...2 Flame Safeguard Page 44 MM Application Possibilities Self Check Side View UV Scanner High Sensitivity...
Страница 53: ...2 Flame Safeguard Page 47 MM Application Possibilities Standard European Side Viewing UV Scanner...
Страница 55: ...2 Flame Safeguard Page 49 MM Application Possibilities Standard North American End Viewing UV Scanner...
Страница 72: ...2 Flame Safeguard Page 66 MM Application Possibilities 2 9 3 Wiring...
Страница 80: ...5 Intelligent Boiler Sequencing Page 74 MM Application Possibilities 5 1 2 DTI Connection Diagram...
Страница 81: ...5 Intelligent Boiler Sequencing Page 75 MM Application Possibilities 5 1 3 Hot Water Example...
Страница 83: ...5 Intelligent Boiler Sequencing Page 77 MM Application Possibilities 5 1 5 IBS Communications...