Commissioning
13.1 Initial Commissioning
ü
The initial commissioning of your fireplace should take place 4 weeks at the earliest after comple-
tion of the cladding, so that all cladding parts are able to dry out completely.
1) Remove all enclosed documents and appliance parts from the fireplace.
2) Read the operating manual through carefully before the initial commissioning.
For optimally lighting we refer you to the section Firing [
}
auf Seite 93] explained.
ð
During the first fire after the system has been completed, this should be kept very small in the
first hour and only gradually increased by increasing the amount of wood laid. However the
amount of wood laid per hour may not be exceeded in the process.
ð
The odours during the first fire are caused by the evaporation of sheet metal greases and
binding agents from the varnishing. Although unpleasant, these fumes are completely non-
toxic. We therefore recommend that you well ventilate the room for the first few fires.
NOTICE
To avoid damage you must
NEVER
operate your Stove a greater quantity of fuel than that specified in
this manual!