
Operating manual Fireplac inserts slied flat + II
EN
11 | Installation
59
11
Installation
Installation must only be carried out by an authorized specialist company.
Before installing the fireplace insert, check that all movable parts are working. Any defects before the
installation of the fireplace insert must be reported.
11.1 Risks and dangers
Schutzausrüstung
The following protective equipment must be used:
Type of protective equipment
Safety gloves
Safety shoes
Arbeitsmittel
The following work equipment is required for this step:
Work equipment
Activity
SW24 spanner
Various adjustment jobs
Slotted screwdriver
var. jobs on the sheet metal heat deflectors
pliers
var. bending jobs
11.2 Durchführung
11.2.1 Placing the fireplace insert
Fig. 17:
Readjusting adjustable feet with
SW24
1) Place appliance on prepared load-bearing base.
2) Adjust the four adjustable feet with an SW24 spanner.
–
Should the length of the threaded rod be insuffi-
cient, the four mountings can be adjusted in height.
Содержание 120x45
Страница 111: ...111 Notizen notes appunti remarques...