3.
Transport, storage and packaging
3.1.
Transport
For transport to place of installation, use sturdy packaging.
Transport gearbox and actuator separately.
Hovering load!
Risk of death or serious injury!
→
Do NOT stand below hovering load.
→
Do NOT attach hoist with ropes or hooks to handwheel.
→
Fix hoist with ropes or hooks as well as eyebolt to gearbox or wrap around the
gearbox and actuator housings.
→
Respect total weight of combination.
→
Lifting via eyebolt is only permissible for the net weight of the gearbox.
Figure 5: Example: Lifting the gearbox
Information
Eyebolt and hoist with lifting accessories are not included in the AUMA scope of
delivery.
Table 2:
Weights
[kg]
Type
6.0
GP 10.1
6.0
GP 14.1
19.5
GP 16.1
55
GP 25.1
63.5
GP 30.1 (4:1/8:1)
75.5
GP 30.1 (16:1)
7
GP 10.1 – GP 30.1
Transport, storage and packaging
Содержание GP 10.1
Страница 1: ...Multi turn gearboxes GP 10 1 GP 30 1 Assembly and commissioning Operation instructions...
Страница 19: ...8 Spare parts 8 1 Multi turn gearboxes GP 10 1 GP 14 1 2 4 1 3 1 4 1 19 GP 10 1 GP 30 1 Spare parts...
Страница 21: ...8 2 Multi turn gearboxes GP 14 1 4 1 8 1 21 GP 10 1 GP 30 1 Spare parts...
Страница 23: ...8 3 Multi turn gearboxes GP 16 1 4 1 8 1 23 GP 10 1 GP 30 1 Spare parts...
Страница 25: ...8 4 Multi turn gearboxes GP 25 1 30 1 16 1 25 GP 10 1 GP 30 1 Spare parts...
Страница 27: ...8 5 Multi turn gearboxes GP 25 1 30 1 4 1 8 1 27 GP 10 1 GP 30 1 Spare parts...
Страница 29: ...29 GP 10 1 GP 30 1...
Страница 30: ...30 GP 10 1 GP 30 1...